Reported | 01/12/2022 10:42 AM |
Project Title | UAB Hospital - UAB IRF Site Utility Relocation Project |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of site utility relocation in preparation for the future construction of the UAB IRF Project. The scope of work includes bringing new power Duct Bank onto the site and the relocation of the existing chilled water utility lines on the site. * Addition of Power Duct Bank: * Construct approximately 82` of Duct bank to include (9) 5" PVC conduits in a 3x3 configuration * Associated sub-base roadway repair, restriping * Relocation of the Chilled Water Lines: * Relocate approximately 90 linear feet of paired 8" chilled water lines on the southwest side of the site * Relocate approximately 130 linear feet of paired 12" chilled water lines on the east side of the site * Relocate approximately 82 linear feet of paired 10" chilled water lines on the northeast side of the site. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |