Similar Projects
Devil's Creek IRSC
Design
Fort Collins, CO 80526

Dust Abatement 2021
Bidding
Steamboat Springs, CO

BLM-Co Wildcat Mastication and Manual - 699 Acres
Bidding
Craig, CO 81625

Trash Services
Post-Bid
Denver, CO

Dewatering Polymer
Post-Bid
Boulder, CO 80306

PKAA, Ben Butler Project
Results
Less than $84,865 est. value
Denver, CO

2020 Waste Removal & Recycling - Multiple City Facilities
Results
Steamboat Springs, CO

Sludge Hauling Services
Bidding
Louisville, CO

Computers/Electronics Recycling Program
Post-Bid
Aurora, CO

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Carcass Removal Services
Term Contract
Post-Bid
Castle Rock, CO 80104

Disposal of Spoils 2020
Results
Louisville, CO 80027

Timber for Sale
Post-Bid
Pagosa Springs, CO

Matterhorn Snow Plowing Services
Results
Ophir, CO 81426

Trash and Recycle Service
Post-Bid
Frisco, CO

Reported 12/01/2020 12:00 AM
Project Title

Snow Removal Services

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Glenwood Springs is seeking a contractor who can remove snow on an as needed basis. The snow removal will be for the following areas (map is attached: 1. 7th street from Colorado to Cooper Ave (see attached Exhibit). 2. The wing streets on Grand from 7th to 8th Street (see attached Exhibit) 3. Contractor will be required to remove snow from the building front and place it on or past the trench drain for the wing streets and to the curb on 7th Street (see attached Exhibit). 4. Contractor to provide monthly itemized billing indicating days of service provided and total hours worked per day. 5. Contractor must perform snow removal by 7:00 am if 1 inch of snow accumulates the night before. Contractor must be available to shovel snow throughout the day if snow accumulates to a depth of 1 inch at any given time.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents