Similar Projects
Replace Well Pump - Lieber Correctional
Renovation
Sub-Bidding
$50,000 CJ est. value
Ridgeville, SC 29472

Water Transmission Main Protective Measures Pressure Reducing Valve Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Myrtle Beach, SC 29577

Plumbing Services
Alteration
Post-Bid
Goose Creek, SC 29445

Plumbing Services IDC
Alteration
Post-Bid
Beaufort, SC

Provide/Install Water Bottle Stations
Alteration
Results
Anderson, SC

Install Bottle Fill Fountains
Alteration
Results
Anderson, SC

Detention Center Plumbing Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Abbeville, SC 29620

On Call Plumbing Services
Alteration
Post-Bid
Richland, SC

Standpipe Replacement Project
Infrastructure, Alteration
Results
$2,000,000 est. value
Lugoff, SC 29078

Bamberg RCP 54" Pipe - ERHARDT Road
Term Contract
Sub-Bidding
Columbia, SC 29201

Water Cooler Installation Services
Alteration
Post-Bid
Anderson, Easley, Pendleton, Seneca, Westminster, SC 29670

Plumbing Maintenance and Repairs Services
Alteration
Results
Spartanburg, SC

Chester County School District - School Back-Flow Installation
Renovation
Sub-Bidding
$385,000 CJ est. value
Chester, SC 29706

On-Call Plumbing Services
Alteration
Post-Bid
Rock Hill, SC

Plumbing System
Alteration
Results
Columbia, SC

Last Updated 02/04/2023 08:02 AM
Project Title

Racetrack Road Water Line

Physical Address View project details and contacts
City, State (County) Woodruff, SC 29388   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $188,825 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor necessary to all work tasks associated witht he Racetrack Road Water Line Project, generally consisting of: - 200 lf of 8" DIP (Push-On Joint) water line (via open cut) - 50 lf of 6' DIP (Push-On Joint) water line (via open cut) - 400 lf of 8" HDPE water line (via horizontal directional drilling) - The installation, maintenance, and removal of erosion control facilities - Other associated appurtences for a complete and proper installation If substantial completion is not achieved within the specified time, the Bidder may become liable for liquidated damages in the amount of $500.00 per calendar day for each day the project remains uncompleted. Each bidder must inform him self fully ofthe conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder ofthe obligation to fomish allmaterial and labor necessary to carry ou tthe provisions of the contract. Insofar as possible, the Contractorin carrying out the workmust employ such methods or means as will not cause any intenuption of or interference with the work of any other contractor. Throughout the Project Documents, reference is made to specifications and standards issued by nationally recognized professional and/or trade organizations 1. These referenced standards are generally identified by abbreviating the name of the organization following with the specification/standard number 2.Unless specifically indicated otherwise, all references to standards refer to the latest edition available at the time of the bidding. liquidated damages in the amount of $500.00 per calendar day

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents