Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

I-70 Picadilly Design Build
Infrastructure
Bidding
Aurora, CO 80040

Scour Mitigation for Two Twin Structures
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80019

Riser Rings
Term Contract
Post-Bid
CO

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

On-Site Improvements
Results
Greenwood Village, CO 80111

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Last Updated 08/24/2022 03:04 PM
Project Title

Oxford Avenue Sanitary Sewer Relocation

Physical Address View project details and contacts
City, State (County) Englewood, CO 80110   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer - 07/08/22
Owner View project details and contacts
Architect View project details and contacts
Description

Bids were rejected. It came in too high. Oxford Avenue Sanitary Sewer Relocation includes the installation of 330 LF of 8 PVC sanitary line between an existing manhole and new manhole for the relocation. The new manhole is to be constructed over an existing 21 VCP sanitary main. There is an existing manhole connection and bench rework for rerouting the flow and manhole and main abandonment. The work is off W. Oxford Avenue within the ROW, along the side of W. Oxford Avenue. There is concrete curb cut replacement and asphalt patching of the entrance to an industrial recycling center. The project is situated in the Valley Sanitation District, in Sheridan, Colorado. October 31, 2022 Project completion date is flexible, but everything must be completed by October 31st, 2022. The work has to be continuous within 33 days. Bids may not be withdrawn for a period of forty-five (45) days after the time fixed for bid closing. The Owner reserves the right to waive irregularities or technical defects, so the best interests of the District may be served, and may reject any and all bids, and shall award the contract to the lowest responsible bidder as determined by the District.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents