Similar Projects
Levan Scott Academy School Expansion & Renovation
Addition - 72,000 SF
Design
$11,600,000 est. value
Fort Wayne, IN

Abbett Elementary School Addition
Addition - 5,600 SF
Design
$2,400,000 est. value
Fort Wayne, IN

Esser 2023 Ventilation at Bunche and Indian Village and RTU at Young
Renovation
Sub-Bidding
$200,000 CJ est. value
Fort Wayne, IN 46802

Esser 2023 Ventilation at Bunche and Indian Village and RTU at Young
Renovation
Sub-Bidding
$200,000 CJ est. value
Fort Wayne, IN 46802

Homestead High School Phase 2B
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

HVAC and Mechanical Products
Term Contract
Post-Bid

FWCS: CMc Services for Renovation, and Accessibility and Security Improvements
Renovation
Results
Fort Wayne, IN 46819

FWCS: CMc Services for Renovation, and Accessibility and Security Improvements
Renovation
Results
Fort Wayne, IN 46819

Smith Academy For Excellence Renovation
Renovation - 60,000 SF
Design
$12,000,000 est. value
Fort Wayne, IN 46806

HVAC Repair and Replacement
Post-Bid
Fort Wayne, IN 46805

Annex and Administration Building
Renovation
Results
New Haven, IN 46774

Pre-Conditioned Air Units and 2 Ground Power Units
Post-Bid
Fort Wayne, IN

Construction Manager As Constructor (CMC) Services for the Renovation of Arlington and Lincoln ES
Renovation
Results
$11,680,000 est. value
Fort Wayne, IN

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Fort Wayne Campus - Neff Hall HVAC Unit Ac-1 Replacement -2021
Alteration
Results
Fort Wayne, IN

Last Updated 08/16/2022 05:32 AM
Project Title

Fort Wayne Community Schools ESSER 2023 Boiler / Chiller Repairs

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of: Primary Engineering, Inc. Bids shall be received from a single prime contractor. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents