Similar Projects
Ryle High School Flooring Upgrades
Alteration
Bidding
Union, KY 41091

Summer Projects
Infrastructure, Alteration
Bidding
$675,000 est. value
Winchester, KY

Marmoleum Tile
Post-Bid
Owensboro, KY

2021 BCPL Scheben Branch Carpet
Post-Bid
Union, KY 41091

Floor Installation
Results
Lexington, KY

Gym Floor Replacement at Highland Middle School
Results
Louisville, KY 40205

Contractor - Replace Epoxy Floor Coating
Alteration
Bidding
$250,000 to $500,000 est. value
Bowling Green, KY

Carpeting, Flooring and Painting
Renovation
Post-Bid
Frankfort, KY 40601

Stage Floor Replacement at Atherton High School
Results
Louisville, KY 40205

Gymnasium Floor Refinishing
Post-Bid
Crestwood, KY

Cline and Reiley Elementary Schools Flooring Replacement 2020
Results
Less than $448,000 est. value
Alexandria, Cold Spring, KY 41076

Shelter of Hope Flooring
Post-Bid
Ashland, KY

ESH 2nd Floor Renovations
Alteration
Results
$61,005 est. value
Lexington, KY 40511

Lincoln County Health Department / New Flooring
Post-Bid
KY

Bathroom Upgrades and Flooring
Alteration
Results
Vanceburg, KY 41179

Reported 05/18/2022 12:00 AM
Project Title

Marshall County Schools Flooring Replacement

Physical Address View project details and contacts
City, State (County) Benton, KY   (Marshall County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022, Construction Completion Expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the replacement of various finish flooring materials, in select areas, within multiple facilities, throughout the school district. This work includes, but not necessarily limited to; demolition and proper disposal of resilient/carpet/rigid tile flooring and base, preparation and installation of new replacement resilient/carpet/rigid tile flooring and base, preparation and installation of new replacement resilient/carpet/rigid tile flooring and base. In addition, removal and reinstallation of related building components such as toilet fixtures, toilet compartments, millwork, etc. shall also be included as required by conditions encountered. Electronic copies can be obtained with a NON-REFUNDABLE AMOUNT of $50.00 which can be paid by check, credit card or charged to you River City Printing account. ELECTRONIC COPIES MAY BE OBTAINED PROVIDED ONE HARD COPY SET AS NOTED ABOVE. Project Identification: Marshall County Schools- Flooring Replacement Project 1. This work shall be required and occur at multiple facilities throughout the County.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents