Similar Projects
Traffic Signal Replacement - NW Circle Boulevard/N W Highland Drive - City of Corvallis
Infrastructure
Conception
$592,000 CJ est. value
Corvallis, OR 97330

Nick Wilson Memorial Plaza - 97027 - City Of Tigard
New Construction, Infrastructure
Conception
$650,000 CJ est. value
Tigard, OR 97223

Portland Proper Hotel
New Construction, Infrastructure - 170,000 SF
Design
$50,000,000 CJ est. value
Portland, OR 97209

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Design
$908,000 CJ est. value
Winston, OR 97496

Cougar Spillway Gate 2 Rehabilitation
Infrastructure
Bidding
$10,000,000 CJ est. value
McKenzie Bridge, OR 97413

Water Improvements Pavement Repair
Infrastructure
Bidding
$250,000 CJ est. value
Detroit, OR 97342

CAMS(Capitol Accessibility Maintenance and Safety) Phase III BP #3 - Demo, Concrete and Excavation
Demolition, Renovation, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Salem, OR 97301

Rural Arterial Recessed Raised Pavement Markers Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Oregon City, OR 97045

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

Big Creek Hatchery Residence Replacement Site Work
Infrastructure
Results
$40,000 to $45,000 est. value
Astoria, OR 97103

Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Results
$2,600,000 to $2,900,000 est. value
Boardman, OR

89th Avenue Residential Development
Demolition, New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Portland, OR 97216

Wings & Waves Waterpark and Hotel Development
New Construction, Infrastructure, Renovation - 99,000 SF
Pending Verification
$35,000,000 CJ est. value
McMinnville, OR 97128

Monroe Street Greenway Improvements - City of Milwaukie
Infrastructure
Conception
$2,899,987 CJ est. value
Milwaukie, OR 97222

Last Updated 08/16/2022 12:02 PM
Project Title

2022 Waterline Improvements NW Deer From 1st to 3rd Street

Physical Address View project details and contacts
City, State (County) Prineville, OR 97754   (Crook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $277,887 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade an existing 6" waterline between West 1st Street & NW 3rd street on NW Deer Street. The City of Prineville is requesting bids to upgrade an existing 6" waterline between West 1 st Street and NW 3 rd street on NW Deer Street. This project will tie an 8 inch C-900 PVC line into an existing valve in NW 3 rd and run next to a 6 inch OD&W pipe for 2 blocks. The project will tie back into an existing valve on West 1 st street. This project will reconnect 8 existing services into the new line, 3 each are 2 inch and 5 each are 3/4 inch meters. The project will install a bulb out on the SW corner of 2nd and Deer. That work will require storm drains and 3 catch basins to be installed. All project work shall be complete by the beginning of October to facilitate patching back all disturbed asphalt. Engineers estimated cost for the project is $240,000.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents