Similar Projects
Highway 50 East Water Main Replacement Project
Infrastructure
Bidding
$279,000 est. value
Carson City, NV 90745

Humboldt-Lander South Area Neighborhood Water Main Replacement
Infrastructure
Bidding
$2,745,900 to $3,356,100 est. value
Reno, NV 89508

Brunswick Transmission Main Repair
Post-Bid
Carson City, NV

Airport Waterline Replacement Labor Commission Project
Infrastructure
Post-Bid
Mesquite, NV

Hollywood System Centennial To Speedway #2 Detention Basin
Results
$9,000,000 to $9,500,000 est. value
North Las Vegas, NV 89031

Kings Row Fire Flow Upgrades
Results
$153,900 to $188,100 est. value
Reno, NV

Phase II Infrastructure Construction for the Harry Reid Research and Technology Park
Renovation, Infrastructure
Post-Bid
$3,800,000 est. value
Spring Valley, NV 89113

Water Main Replacement Project for G Street and Shriver Boulevard
Results
$338,962 to $414,286 est. value
Reno, NV

Maryland Campus Vault Repairs
Results
$150,000 est. value
Las Vegas, NV

Newport Lane Water Main Replacement
Results
$278,757 to $340,703 est. value
Reno, NV

Sparks Marina Lake Level Control Pipeline Project
Infrastructure
Results
$815,270 est. value
Sparks, NV

Caughlin 5 Pressure Zone Looping
Infrastructure
Results
$608,850 to $744,150 est. value
Reno, NV

South Virginia 24" Main (Kumle To Peckham)
Alteration
Results
$1,024,650 to $1,252,350 est. value
Reno, NV

Backflow Preventer Replacements at North Las Vegas Airport
Infrastructure
Results
North Las Vegas, NV 89032

Backflow Testing City Wide
Term Contract
Results
North Las Vegas, NV

Last Updated 12/01/2021 08:53 AM
Project Title

Venturi Meter and Control Valve

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase of one (1) 20" Venturi Meter with control valve, (2) 16" Venturi Meter with control valve, (1) 14" Venturi Meter with control valve, (1) 8" Venturi Meter with control valve and materials necessary for a complete installation by Owner. See Bid package for full details.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents