Similar Projects
New Bern Boat Storage
New Construction, Infrastructure
Bidding
$430,000 CJ est. value
New Bern, NC 28562

Provide ATFP Bollards NHC B4389
Renovation
Bidding
$250,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

North Carolina MATOC for General and Design/Build Construction
Term Contract
Post-Bid
$250,000,000 CJ est. value
Apex, NC 27523

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Y--Design-Bid-Build (Dbb) P990 F-35B Vertical Lift Fan Marine Corps Air Station, Cherry Point, North Carolina.
New Construction - 10,500 SF
Results
$10,000,000 to $25,000,000 est. value
Cherry Point, Havelock, NC 28533

B4504 Repair Damaged Magazine
Renovation
Results
$25,000 to $100,000 est. value
Cherry Point, NC 28533

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

P134, Construct Slocum Road Physical Security Compliance
New Construction, Infrastructure, Renovation
Post-Bid
$100,000,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Roadhouse - Cherry Point
New Construction
Post-Bid
NC

Site Preparation for F-35 Turbo Machine
Renovation
Post-Bid
$1,000,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Repair Airfield Arresting Gear
Renovation
Post-Bid
$250,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Repair Warehouse Floors B147, 148, 150, 159
Renovation
Post-Bid
$500,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Parking Lot Addition B496
Renovation
Post-Bid
$500,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Replace Steam and Condensate Lines Building 153
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Cherry Point, NC 28533

Repairs and Improvements BEQ 4197
Renovation - 54,000 SF
Post-Bid
$10,000,000 CJ est. value
Cherry Point, NC 28533

Last Updated 08/29/2022 07:34 PM
Project Title

Climate Controlled Storage for F-35 Components, Building 149

Physical Address View project details and contacts
City, State (County) Cherry Point, NC 28533   (Craven County)
Category(s) Government/Public, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

GET/Terracon Project No. K3227001 Project No.: 7233832 Title: Climate Control Storage F35 B149 NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction Contractors, 39.5 Million Contract Completion Date: 180 days after award Estimated Cost Range: Between $250,000 and $500,000 Wage Determination: General Decision Number: NC20220065 02/25/2022 Liquidated Damages: $271.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Monday, 15 August 2022 at 9:00 AM Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. Climate Control Storage F35 B149 REQUEST FOR PROPOSAL MCAS Cherry Point, North Carolina Project No. 7233832 8/9/2022 FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. Proposal Due Date: 30 August 2022 @ 2:00 PM EST E-Mail Address for Proposals: is listed below: 1. roicc_chpt_ktr_bids@navy.mil 2. ericka.j.bishop.civ@us.navy.mil 3. linda.b.clark14.civ@us.navy.mil *Note: Proposals must be sent to ALL of the above email addresses. Subject line should contain the project number and contractor name. Proposals may also be hand-delivered to Building 87 and must be stamped/signed in by proposal due date and time. Requests for Information (RFIs): RFIs must be submitted by the prime contractor to the email addresses above. The cut off for RFIs is 20 August 2022 by 9:00 AM EST in order to process all inquiries by the proposal due date. The specifications and drawings are posted as attachments on https://sam.gov/. "OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT AVILABLE, NO AWARD WILL BE MADE AS RESULT OF THIS SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM THIS SOLICITATION." *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work is for Building 149. It is is a 41,300 square foot warehouse with multiple bays that stores military equipment and components. The purpose of the project is to provide a climate controlled space within an empty work bay of Building 149 for storage of F-35 Hazardous Materials. The storage space must meet the requirements of F-35 Lightning II Facilities Requirements Document attached in this Scope of Work (SOW). Construction must be completed by January 2023. The project includes HVAC, fire protection, plumbing fixtures, lighting, electrical outlets, and telecommunication. and incidental related work.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents