Similar Projects
Lingle to Lusk US 85(JCT Wy 156/157) - N853100 - Goshen County
Infrastructure
Conception
$8,586,000 CJ est. value
Lingle, WY 82223

Lingle to Lusk US 85(JCT Wy 156/157) - N853100 - Goshen County
Infrastructure
Conception
$8,586,000 CJ est. value
Lingle, WY 82223

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Crack Seal
Infrastructure
Results

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous
Infrastructure
Results

Southwest Wyoming Mental Health Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Torrington, WY 82240

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Bituminous Pavement Surfacing
Infrastructure
Results

FY23 Public Works Facility Garage Addition
Addition, Demolition, Infrastructure
Post-Bid
$420,000 CJ est. value
Torrington, WY 82240

District 2 Chip Seal
Infrastructure
Results

City of Torrington - FY2020 Wastewater Pre-Treatment Facility Project
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Torrington, WY 82240

Walk Path Phase II
Infrastructure
Results
$400,000 est. value
La Grange, WY

FY23 Golf Course Parking Lot Improvements (Phase I)
Infrastructure
Post-Bid
$190,000 CJ est. value
Torrington, WY 82240

Shuck Street Water Improvements
Infrastructure
Results
$78,187 CJ est. value
Yoder, WY 82244

Last Updated 12/12/2022 02:14 PM
Project Title

Torrington Retail Development

Physical Address View project details and contacts
City, State (County) Torrington, WY 82240   (Goshen County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The location and scope details have not been released. As of December 12, 2022 the project is in planning stage. The Torrington City Council approved a rezoning request on November 15, 2022. Information regarding the developer, architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the second quarter of 2023.

Details

1 Story Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents