Similar Projects
Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Grading, Drainage, Paving, Signals and Retaining Wall
Infrastructure
Bidding
$1,500,000 CJ est. value
Shelby, NC 28150

Grading, Drainage, Paving, Signals and Retaining Wall
Infrastructure
Bidding
$1,500,000 CJ est. value
Shelby, NC 28150

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Transportation Asset Management Plan Resurfacing - Phase I
Infrastructure
Results
Shelby, NC

Construction of a Round-About at the Intersection of NC 180 and SR 2202
Infrastructure
Results
NC

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Patterson Homes
New Construction, Infrastructure
Pending Verification
$47,400,000 CJ est. value
Kings Mountain, NC 28086

Overlook and Trail Improvements at Crowders Mountain State Park - The North Carolina Parks and Recreation Authority
Infrastructure
Conception
$1,750,000 CJ est. value
Kings Mountain, NC 28086

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Last Updated 07/26/2023 07:48 AM
Project Title

Raw Water Weir Improvements

Physical Address View project details and contacts
City, State (County) Lawndale, NC 28090   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $9,985,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of construction of two new low-head weirs, each including moveable crest gates and boulder cascades. The Project will also include stabilization of the stream banks. The Project has an expected duration of 570 days. Payment can be made by either: 1.Credit Card 2.Check made payable to Duncan-Parnell - mail check to: 11333 a Granite St, Charlotte, NC 28273 ATTENTION: MARK DEVLIN. To expedite your order you can email copy of your check to website Printing will not begin until a copy of the check OR the check is received 3. Duncan-Parnell Account Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Laura Wallace, Email at laura@willisengineers.com

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents