Similar Projects
ERPS Series 1 Projects - Bid Package 4 - Track, Parking Lots and Sidewalks
Infrastructure
Design
$300,000 CJ est. value
Eaton Rapids, MI 48827

Mt. Hope Park North Ballfield Development and Mt. Hope Park Perimeter Pathway
New Construction, Infrastructure
Bidding
$1,983,216 CJ est. value
Grand Ledge, MI 48837

Mt. Hope Park North Ballfield Development and Mt. Hope Park Perimeter Pathway
New Construction, Infrastructure
Bidding
$1,983,216 CJ est. value
Grand Ledge, MI 48837

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Williams St. at RxR Crossing Water Main Improvements
Alteration
Post-Bid
$218,200 est. value
Bellevue, MI

FY21Pump Station Repairs at Dolphin Jefferson Outlet Station
Renovation
Results

Overband Crack Fill
Infrastructure
Results
$923,290 CJ est. value
Charlotte, MI 48813

Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter and Sidewalk Ramps, Storm and Sanitary Sewer and Pavement Markings on Hall Street
Infrastructure
Bidding
$2,545,000 CJ est. value
Charlotte, MI 48813

Grand Ledge Delta Center Elementary
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Lansing, MI 48917

Ultium 3 Battery Plant Bid Package 2 - Ultium 3 Lift Station
New Construction, Infrastructure
Results
$2,756,000 CJ est. value
Lansing, MI 48917

RFQ Construction Manager - New State Public Health and Enviro Science Lab
New Construction, Infrastructure
Post-Bid
$220,000,000 CJ est. value
Windsor charter Township, MI 48821

ERPS Series 1 Projects - Bid Package 3 - Playground, Bleacher Replacement & Press Box Renovation
Renovation, Infrastructure
Results
$920,965 CJ est. value
Eaton Rapids, MI 48827

Cement
Infrastructure
Post-Bid
$200,000 CJ est. value
Bellevue, MI 49021

Erickson Power Station Ash Impoundments Closure
Infrastructure
Post-Bid
$900,000 CJ est. value
Lansing, MI 48917

Phase III Sitework and Renovations Parkview Elementary, Charlotte Middle School and Upper Elementary Bid Package 3-1
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Charlotte, MI 48813

Last Updated 01/27/2023 09:37 AM
Project Title

Ultium 3 Battery Plant Bid Package 3 - GM Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Lansing, MI 48917   (Eaton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Architect - 10/05/22
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 23, 2023, no bids received. As of this time it is unknown if and when project will rebid..** Ultium 3 Battery Plant Bid Package 3 - GM Pump Station Improvements. The work consists of improvements at the existing Delta Township GM pump station generally consisting of the following items: modifications to the existing ductile iron piping to accommodate the addition of a second forcemain, addition of influent flow metering and sampling, modification of the influent sewer system to accommodate the addition of a forcemain connection from the Ultium 3 Lift Station, installation of Owner-Procured Raw Sewage Pumps, forcemain, valves, effluent flow metering, electrical improvements, bypass pumping, selective demolition, and miscellaneous site improvements related to the described work. Questions may be directed to Jennifer.Drinan@ohm-advisors.com or Sherri.Wright@ohm-advisors.com at 734-522-6711. 5% of bid amount PN - 089181.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents