Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

Design and Construct a Parks and Recreation Building
New Construction, Infrastructure - 2,400 SF
Design
$2,000,000 CJ est. value
Dover, DE 19904

College Road Pump Station Upgrade/Replacement
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Dover, DE 19904

Big Oak Park Entry Road Paving Project
Infrastructure
Bidding
$4,000,000 CJ est. value
Smyrna, DE 19977

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Water Meter
Term Contract
Results
Dover, DE

2020 Streets Utility Project
Infrastructure
Results
Milford, DE

FY19 Inflow and Infiltration Project
Infrastructure
Design
$140,000 CJ est. value
Dover, DE 19904

Smyrna High School - Athletic Field, Track, and Tennis Surface Renovations
Infrastructure
Bidding
$400,000 CJ est. value
Smyrna, DE 19977

Heritage Elementary School Dehumidifier Installation
Post-Bid
Wilmington, DE 19808

Underground Utility Locating Services
Term Contract, Infrastructure
Results
Dover, DE

Demolition of 33 South Queen Street
Demolition, Infrastructure
Design
$9,850 CJ est. value
Dover, DE 19901

Last Updated 08/18/2022 03:35 PM
Project Title

Eastlake Garden Drainage Basin Improvements

Physical Address View project details and contacts
City, State (County) Dover, DE 19904   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project, identified by staff, will upgrade the existing stormwater infrastructure in the East Lake Garden development. This area consistently floods with a moderate rain event in the City. As of April 13, 2021, this project is included City of Dover FY 2021-2025 CIP. An architect has been selected for the project. Information regarding design firm and general contractor selection has not been disclosed. Construction is slated to begin in 2022; however, a firm date has not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents