Similar Projects
Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Grading
Results
Less than $500,000 est. value
FL

Pedestrian Crossing/Box Culvert/ADA Compliant Ramp/Cantilever Retaining Wall
Results
Less than $5,306,230 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage Repair
Results
Less than $102,000 est. value

Western Lake Phase II Drainage Improvements
Results
Less than $649,005 est. value
FL

Drainage
Results
Less than $100,000 est. value

Grading
Results
Less than $400,000 est. value
DeFuniak Springs, FL 32433

Grading
Results
Less than $300,000 est. value
FL

Eve Circle Roadway & Drainage Improvements
Results
$958,151 est. value
De Funiak Springs, FL 32433

Parking Lot Expansion Freeport Business Park
Results
FL

Retention Pond Maintenance
Results
$25,000 est. value
FL

Lakewood Drive Drainage and Pedestrian Improvements Phase I
Infrastructure
Results
FL 32435

Parking Lot Expansion for Freeport Business Park
Infrastructure
Results
FL

Last Updated 02/11/2022 04:43 AM
Project Title

Shoulder and Ditch Work

Physical Address View project details and contacts
City, State (County) FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Improvements under this Work Document Driven Contract consist of reshaping ditches and reworking shoulders along State Road 8 (Interstate 10) in Walton County. These ditches are non-typical and should be re-graded to +/- 3 inches of the original flow line to create a free and unobstructed flow of drainage water Section 0001 Sodding (Sy) 0104- 10- 3 Sediment Barrier Lf 1,500.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 150.000 E120- 10- 2 Clean and Reshape Ditch (Haul) Lf 1,000.000 E570- 5- Fertilizer Tn 25.000 E570- 9- 1 Water for Grass & Plants Mg 100.000 E573- 1- Hydro-seeding - Application of Slurry Including Wood Fiber, Seed, Fertilizer, Tackifier & Dye Sy 10,000.000 E575- 1- Sodding Sy 115,000.000 E577- 70- Shoulder Rework Sy 115,000.000 E577- 71- Blading Paved Shoulder, Up to 24" Beyond Pavement Lf 5,000.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents