Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Homestead ARB BAK 12
Bidding
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Annual Civil Repairs and Maintenance at HWO
Term Contract
Bidding
Miramar, FL 33023

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Taxiway A Lighting Improvements at Valkaria Airport
Bidding
FL 32949

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Ormond Beach Municipal Airport Taxiway Bravo and Delta Rehabilitation Project (Construction Phase)
Bidding
$1,800,000 est. value
Ormond Beach, FL 32176

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.
Post-Bid
Panama City, FL 32403

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Runway Object Free Area (ROFA) Roadways Realignment
Bidding
Pensacola, FL

Taxiway Delta Phase II Reconstruction
Post-Bid
Pompano Beach, FL 33060

Last Updated 05/13/2021 11:15 AM
Project Title

Crystal River Airport Runway 9-27 Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Crystal River, FL 34429   (Citrus County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,973,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment, tools, transportation, services, and incidentals to perform all work necessary to construct elements associated with Runway 9-27 rehabilitation at the Crystal River Airport (CGC) in Crystal River Florida. 1. Schedule A: Runway 9-27 Rehabilitation: This Schedule includes the following (all quantities are approximate); mill 1” of the existing 45, 000 SY of asphalt pavement, runway shoulder regrading of 12,500 SY, fill/grade and compact 2,500 CY of embankment with on-site borrow source, apply 3,250 gallons of P-603 bituminous tack coat, pave 5,000 tons of P-403 asphalt mix pavement, provide 65,000 SF runway and taxiway yellow, white and black markings; and provide 13,500 SY of sod. 2. Schedule B: Obstruction Clearing in Wetlands: This Schedule includes clearing trees and brush that penetrate the Object Free Area (ROFA) and Primary Surface and penetrates Part 77 Transitional Surface of Runway 9-27. No mechanized equipment will be allowed within this area, only manually operated power tools to be utilized. The awarded Bidder shall trim trees to the elevations indicated on the plans. The trees shall be trimmed by hand (using chainsaws or hand tools and tree climbing technique), dragged out of the wetland, hauled, and disposed of off airport property.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents