Similar Projects
Construct Pump Station
New Construction
Bidding
Burkeville, VA

River Oaks Pump Station 44 Service Area Phase 2 Water and Sewer Replacement
New Construction
Bidding
Norfolk, VA 23502

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Langley School Pump Station and Force Main
Post-Bid
$3,400,000 est. value
McLean, VA 22101

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of Lake Front Village Pump Station 309 Replacement
Post-Bid
Virginia Beach, VA 23456

Burton Station Sanitary Sewer Pumping Station #370
Results
$130,000 est. value
Virginia Beach, VA 23456

Last Updated 07/09/2021 12:07 PM
Project Title

Rehabilitation Of Sanitary Sewer Lift Station At Concourse B, IAD

Physical Address View project details and contacts
City, State (County) Dulles, VA   (Loudoun County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of the sanitary sewer lift station at Washington Dulles International Airport (IAD) Concourse B. The existing sanitary sewer lift station is 25 years old and was designed to handle the entire sanitary sewer produced at Concourse B. The lift system has electrical service panels, pumps, piping, controls, floats, lighting and switches. The objective of this effort includes a comprehensive assessment of the system, prioritized recommendations regarding the repair, modifications, replacements and upgrades for an energy efficient sanitary sewer lift station.

Details

Lift and Pump Stations, Renovation.
Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Firestopping, Penetration Firestopping.
Division 22 - Plumbing, Facility Sanitary Sewerage, Facility Packaged Sewage Pumping Stations.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Ducts and Casings, Metal Ducts.
Division 26 - Electrical.
Division 31 - Earthwork, Earth Moving.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents