Similar Projects
Massena airport rehabilitating entire main runway
Infrastructure
Design
Massena, NY 13662

Massena airport rehabilitating entire main runway
Infrastructure
Design
Massena, NY 13662

Main Street Pump Station Rehabilitation
Renovation, Infrastructure
Bidding
$1,800,000 CJ est. value
Ogdensburg, NY 13669

North Country Children's Museum 2022 Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Bidding
Potsdam, NY 13676

Dispensers Purchase For 2 LNA
Renovation
Post-Bid

Dispensers Replacements At 4 Lukoil Sites
Renovation
Post-Bid

Clifton-Fine CSD - Capital Improvements Project
Renovation - 19,363 SF
Results
$65,000 to $700,000 est. value
Star Lake, NY 13690

Clifton-Fine CSD - Capital Improvements Project
Renovation - 19,363 SF
Results
$65,000 to $700,000 est. value
Star Lake, NY 13690

Massena Central School District 2019 Capital Improvements Phase 2
Renovation
Construction
$150,000 to $6,700,000 est. value
Massena, NY

Massena Central School District 2019 Capital Improvements Phase 2
Renovation
Construction
$150,000 to $6,700,000 est. value
Massena, NY

Meade Road Solar Project
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, NY 13617

Seaway Visitor Center
New Construction, Infrastructure - 7,500 SF
Pending Verification
$8,400,000 CJ est. value
Massena, NY 13662

Remediation Chemical Purchase and In-Situ Application Design at LNA
Renovation
Post-Bid

231038 - Reconstruct Cooper Service Complex Parking Lot at SUNY Canton
Infrastructure
Results
Canton, NY 13617

Pavement Improvement Project
Infrastructure
Construction
$680,716 CJ est. value
Canton, NY 13617

Last Updated 01/04/2023 03:03 PM
Project Title

2021 Capital Project - General Construction

Physical Address View project details and contacts
City, State (County) Canton, NY 13617   (Saint Lawrence County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Food/Beverage Service, Middle/Senior High School, Office, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $12,160,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 4, 2023, this project has not yet been awarded. The project is expected to be awarded mid February. Central Building SED#51-02-01-06-0-010-024 Bus Garage SED#51-02-01-06-5-012-003 The Canton Central School District invites sealed bids, in duplicate, for: General Construction The Owner reserves the right to waive any informality in or to reject any or all Bids. Each Bidder must deposit with its Bid, security in an amount and form subject to the conditions provided in the Contract Documents. RETURN OF CONTRACT DOCUMENTS Upon returning sets promptly and in re-usable condition to Plan and Print Systems, Inc. within 30 days after the date of the Bid opening, deposits will be refunded as follows: l. Any Bidder will be refunded his or her deposit in full. 2. All other persons receiving any or all the Contract Documents, including Subcontractors and Material Suppliers, will be refunded their deposit in full. All Contract Documents received (except for Documents held by Successful Bidders) must be returned to Plan and Print Systems, Inc., at the above address. For Contract Documents which are not returned to the printer within this 30-day period, deposits will NOT be refunded. OBTAINING ELECTRONIC CONTRACT DOCUMENTS It is the intention of the Project to be both environmentally and fiscally conscious of paper use and consumption. The Contract Documents may be downloaded from the Plan & Print website for a nonrefundable cost of $35. A compact disc (CD) of the bid documents may also be obtained from Plan & Print Systems, Inc., 6160 Eastern Avenue, Syracuse, New York 13211, phone number 315.437.5111, fax number 315.463.1510 upon payment of a non-refundable amount of $35 plus $15.00 for shipping & handling per CD. Checks shall be made payable to Plan & Print Systems, Inc. OBTAINING PAPER (hard copies) Withdrawal of Bids will be subject to the conditions provided in the Instructions to Bidders. Prospective Bidders will be issued a maximum of two (2) sets each. Subcontractors, Material Suppliers, etc., will be issued a maximum of one (l) set each. Contract documents will be delivered via UPS Ground service upon request and receipt of an additional non-refundable delivery and handling charge of $75 (edit per size of project) per set, payable by separate check to Plan and Print Systems, Inc. All requests for delivery to locations outside of Upstate NY will incur an additional shipping charge based on the metering increase for those locations. Any sets required in excess of the above-mentioned maximums are to be obtained directly by interested parties at the full cost of printing, at their cost, directly from Plan and Print Systems. Only complete sets will be issued. At the time the order is placed, plan holder shall advise Plan and Print Systems of status as to prime bidder, subcontractor, or material supplier and to trade affiliation. Postal address, telephone number, and fax number will also be required. An e-mail address is requested but not required. ADDENDA Addenda for this project will be emailed to each plan holder of record, except as noted. Emails will be from BidCaster Notification. Large addenda and addenda containing full sized drawings will be issued in hard copy format only and sent via UPS. It is the responsibility of each prospective bidder to submit an accurate email address when requesting Bidding/Contract Documents and to download each addendum. The "BidCaster Notification" will be sent to the e-mail address on record. Requests for interpretation, information, or clarification (RFI) of the Contract Documents must be made in writing to C&S and King + King. Responses to RFIs will not be made over the telephone. Responses to RFIs will be advisory only and will not modify the Contract Documents. The Contract Documents stand as published except as modified by written Addenda before bid and Modifications after execution of the Agreement. RFIs may be emailed to both: Megan Vanderbrook at mvanderbrook@kingarch.com and Mallory Kwetcian at mkwetcian@cscos.com

Details

Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents