Similar Projects
Landfill Cell 3B-5 Construction Project
Infrastructure
Bidding
$2,900,000 CJ est. value
Dickinson, ND 58601

High Meadows Sewer Collection and Lift Station
New Construction, Infrastructure
Bidding
$1,422,000 CJ est. value
Fort Totten, ND 58335

Sundre Well F Connection Pipeline and Access Road
Infrastructure, Renovation
Post-Bid
$380,000 CJ est. value
Minot, ND 58701

LS 49 and Forcemain
New Construction, Infrastructure
Post-Bid
$4,100,000 CJ est. value
Grand Forks, ND 58201

CRWD - NDSP Pipeline Improvements
Infrastructure
Results
$11,594,000 CJ est. value
Kindred, ND 58051

2022 Lagoon Repairs
Infrastructure
Results
$338,948 CJ est. value
Surrey, ND 58785

New Utility Construction (SS Lift Station 53 Force Main)
Infrastructure
Post-Bid
$787,055 CJ est. value
Fargo, ND 58102

2022 Fairgrounds Trunk 36-Inch Sewer Repair
Infrastructure
Results
$163,158 CJ est. value
Minot, ND 58701

Prairie Skies First Addition
Infrastructure
Post-Bid
$950,000 CJ est. value
Casselton, ND 58012

Sanitary Sewer Improvement District 2022
Infrastructure
Results
$2,664,568 CJ est. value
Ashley, ND 58413

Paving Improvement
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Valley City, ND 58072

New Town WTP Filter Box Repairs
Renovation, Infrastructure
Results
$114,000 CJ est. value
New Town, ND 58763

AWUD - User & Transmission Expansion Phase 2
Infrastructure
Post-Bid
$336,000 CJ est. value
Gilby, ND 58235

Lift Station, Force Main, and Wastewater Treatment Lagoon Improvements
New Construction, Infrastructure
Results
$3,786,391 CJ est. value
Center, ND 58530

2023 Sanitary Sewer Rehabilitation - CIPP
Infrastructure
Results
$342,333 CJ est. value
Minot, ND 58701

Last Updated 12/20/2023 08:34 AM
Project Title

Waste and Domestic Supply Pipe Replacement Project

Physical Address View project details and contacts
City, State (County) Dickinson, ND 58601   (Stark County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given to bid on a General Contract, Mechanical Contract or Prime Contract for a waste and domestic supply pipe replacement project at the Southwest Multi-County Correctional Center in Dickinson, North Dakota as described in the Contract Documents as prepared by Prairie Engineering, P.C., Bismarck, North Dakota, Engineer. General work is incidental to plumbing work. This will mostly consist of temporary removal and replacement of ceilings and grid, cutting and patching walls where vertical plumbing risers are replaced, and roof work where vents through the roof are replaced. Plumbing work will consist of replacement of all cast iron waste and vent piping found in the building, scoping and providing an epoxy pipe liner to the underground or inaccessible waste piping, replacement of cold, hot & recirculated hot water supply piping, and replacement of security plumbing fixtures. Electrical work will be incidental to the plumbing work as required. The Owner reserves the right to waive any informalities and to accept or reject any or all Bids. Each Bid must be accompanied by a separate envelope containing a Bidder's Bond in a sum equal to five percent of the full amount of the Bid, executed by the Bidder as Principal and by a Surety Company authorized to do business in this State, conditioned that if the Principal's Bid be accepted and the Contract awarded to the Principal, the Principal, within ten days after notice of award, will execute and effect a Contract in accordance with the terms of the Principal's Bid and a Contractor's Bond as required by law and the regulations and determinations of the governing board. All Bidders must be licensed for the highest amount of their Bids, as provided by Section 43-07-12 of the ND Century Code. No Bid will be read or considered which does not fully comply with the above provisions as to Bond and Licenses, and any deficient Bid submitted will be resealed and returned to the Bidder immediately. No Bidder may withdraw his Bid within 30 days after the actual opening of Bids.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents