Similar Projects
Morningstar at Cherry Cherry Creek Senior Living
New Construction - 97,330 SF
Conception
$40,000,000 est. value
Denver, CO 80223

Applewood Pointe of Westminster
New Construction - 127,500 SF
Conception
$10,000,000 CJ est. value
Westminster, CO 80021

Stoney Point Meadows
New Construction - 177,000 SF
Design
$30,000,000 est. value
Fort Collins, CO

Pathways Hospice Inpatient Care Center
New Construction
Design
$8,000,000 est. value
Fort Collins, CO

Sober Living Residential Services
Results
Denver, CO

VOA Senior Residences
New Construction - 46,300 SF
Construction
$5,000,000 est. value
Fort Collins, CO 80521

The Legend at Focus on the Family
New Construction - 85,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80920

Assisted Living Center
New Construction - 78,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Loveland, CO

Fox Drive Assisted Living and Memory Care Facility
New Construction - 18,499 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Thornton, CO 80260

Balfour Senior Living At Fort Collins
New Construction - 250,000 SF
Conception
$10,000,000 CJ est. value
Fort Collins, CO 80528

Morningstar Senior Living
New Construction, Build-Out - 19,027 SF
Design
Fort Collins, CO 80524

Arvada Manor Congregate Care
Renovation, Addition - 3,356 SF
Construction
Arvada, CO 80004

Stanford Senior Living
New Construction - 40,125 SF
Pending Verification
Fort Collins, CO 80525

Polestar Village Residential Development - Master Plan
New Construction
Conception
Fort Collins, CO 80521

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Reported 12/10/2021 12:00 AM
Project Title

Wind Crest Care Center Expansion & Pedestrian Bridge

Physical Address View project details and contacts
City, State (County) Highlands Ranch, CO 80129   (Douglas County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Bids by Invitation.
Project Status Sub-Bidding, Construction Start Expected March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Assisted Living Facility, 4 Stories Above Grade, New Construction, 3.58 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents