Project Title | GSR and Pump Station Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cavalier, ND (Pembina County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract No.1 – General Construction: Work generally consists of water main tie-in between the reservoir and distribution system and addition of storm drain from the new reservoir overflow to the street, temporary water service from rural water into the GSR to the new water main tie-in to allow the reservoir to be out of service for demolition and construction. Work within the City Utilities Building includes disconnection of the high service pumps and installation of a blind flange; abandon pumps in place. Demolition includes the rural water building atop the existing reservoir, the existing reservoir roof, columns, and up to 2-feet of side walls and fill of portions of the reservoir which will not be utilized with the new GSR. Structural work includes a new concrete floor, walls, baffles and roof of the new 225,000-gallon GSR within the existing GSR footprint and a new 16’ x 24’ wood framed pump station building atop the reservoir. Civil work consists of removal and replacement of asphalt pavement, curb and gutter, and sidewalk. Work further includes the associated piping, valves, fittings and appurtenances within the new pump station with pipe ranging from 4 to 8-inch in size and including installation of two new 20-HP high service vertical turbine pumps. Contract No.2– Electrical Construction: Work generally includes all electrical construction and associated demolition of existing GSR meter station, construction power and heating of temporary bypass meter facilities and construction of new pump station; Variable frequency drives; Control panels; Instrumentation; Power distribution panels; Conduit, and wiring; Interior and exterior general power and lighting; and all related Work. Contract No.3 – Combined General and Electrical Construction: Work generally includes construction consisting of all Work described under Contracts No. 1 and No. 2. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |