Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

CSC-20019; DSCC BLDG 27 Boiler Conversion
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Whitehall, OH 43213

Mechanical System Improvements
Alteration
Bidding
$1,650,000 est. value
Toledo, OH

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Post-Bid
Less than $130,000 est. value
Centerville, OH

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

Stokes Mall Boiler Replacement
Results
$225,000 to $350,000 est. value
OH

Chiller Repairs at Wright-Patterson Air Force Base
Design
$5,000,000 to $10,000,000 est. value
Wright Patterson Air Force Base, OH

DOW/HCWP/Electric Water Heater
Alteration
Bidding
Columbus, OH

Replacement of (2) DW Gas-Fired Heating Boilers, (2) Heat Exchanger Pumps and (2) Storage Tanks at The Pincrest Apartment
Post-Bid
Cincinnati, OH 45200

Energy Center Boiler Controls
Results
Less than $270,000 est. value
Akron, OH 44325

Multiple Building Chiller Replacements
Post-Bid
Less than $1,200,000 est. value
Columbus, OH

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

WSHP Loop Piping Replacement
Post-Bid
Pandora, OH 45877

Reported 07/10/2021 12:00 AM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Marietta, OH   (Washington County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing boilers, pumps, flue, controls, and portions of existing hot water supply and return and gas piping. Provide new condensing boiler boilers, pumps, controls, and portions of hot water supply and return and gas piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents