Similar Projects
Casa Grande-la Palma Hwy (SR 287) (Hacienda - SR 87)
Infrastructure
Bidding
$740,000 est. value
Coolidge, AZ 85128

N35(8)1,2 and 4 Road Improvement Project
Infrastructure
Bidding
$2,000,000 est. value
Bapchule, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Construction Manager at Risk for East-West Corridor Roadway Improvements
Post-Bid
Maricopa, AZ

Battaglia Road Reconstruction Project
Results
Less than $742,000 est. value
Eloy, AZ 85131

Magma Road Improvements Hunt Highway to Gary Road
Results
$5,000,000 est. value
Florence, AZ 85232

Mission Royale Community Facilities District Parcel 5 Public Improvements
Infrastructure
Post-Bid
Casa Grande, AZ

Anthem at Merrill Ranch CFD 2, Phase XXI - Unit 24 Concrete and Paving
Results
Florence, AZ

Mission Royale Community Facilities District Parcel 6 Public Improvements
Infrastructure
Post-Bid
Casa Grande, AZ

Florence Boulevard and Trekell Road Intersection Improvements
Results
Casa Grande, AZ 85222

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Highway Pavement Preservation Project
Results
$1,000,000 to $1,500,000 est. value
Casa Grande, AZ 85222

Ipaz Build Grant Roadway Improvements
Infrastructure
Post-Bid
Florence, AZ

Crack-Fill All Asphalt Areas (Parking Lots And Drive Lanes) Maricopa, Az
Results
$25,000 est. value
Maricopa, AZ 85138

Thornton Road Improvements Project Phase I - Selma Highway to Peters Road
Infrastructure
Results
Casa Grande, AZ

Last Updated 05/25/2022 03:35 AM
Project Title

Pavement Preservation

Physical Address View project details and contacts
City, State (County) AZ   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed work is located in Pinal County on State Route 77 between mileposts 88.88 to 95.05 and 103.60 to 110.90 near Oracle. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with an Asphaltic Rubber – Asphaltic Concrete Friction Course and a bonded wearing course overlay. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents