Similar Projects
Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Cassia Commons
New Construction - 633,600 SF
Conception
$10,000,000 CJ est. value
Lauderdale Lakes, FL 33311

Naranja 2 VJ
New Construction, Build-Out - 18,000 SF
Design
Miami, FL

Ponce Park Tower
New Construction, Build-Out - 226,332 SF
Design
$67,500,000 est. value
Coral Gables, FL 33134

Town of Surfside 96th Street Park
Renovation
Bidding
$3,289,000 est. value
Surfside, FL 33154

Jeb Estates Park - Playground and General Plan Build-Out
Build-Out
Bidding
$1,600,000 est. value
Miami, FL 33167

Sun-N-Fun Water Park Restoration and Renovation Project
Post-Bid
Naples, FL 34109

Ultimate Sports Park
Post-Bid
$4,521,000 est. value
Pompano Beach, FL 33060

Construction Manager at Risk - Englewood Park Improvements
Results
Englewood, FL 34223

Kaley Square Park Playground Replacement
Results
Less than $369,000 est. value
Orlando, FL 32805

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Atlantic Crossing Artwalk
New Construction - 1,500 SF
Construction
Less than $500,000 CJ est. value
Delray Beach, FL 33483

Town Place
New Construction
Conception
River Park, FL 34952

New Tampa Community Park Inclusive Playground Design-Build
Design
Less than $1,600,000 est. value
Tampa, FL

Vista Park Batting Cage Replacement
Renovation
Bidding
$100,000 est. value
Weston, FL 33332

Last Updated 06/29/2022 10:12 AM
Project Title

Playground Replacement

Physical Address View project details and contacts
City, State (County) Key Colony Beach, FL   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified playground manufacturer/installer to provide a layout design and to supply and install materials/equipment for a designated playground project within the 7th Street Area Park, located at 7th Street, Key Colony Beach, Florida, and installation of shade over existing playground equipment located at the 1st Street Park (the “Project”). Items that must be included in proposals on the Project are as follows: 1. Provision and Installation of Play Equipment / Playground Features for Children 3-12 years of age at 7th Street Park. 2. Installation of Shade over New Equipment at 7th Street Park and over Existing Equipment at 1st Street Park 3. Resurfacing of Existing Rubberized Surface at 7th Street Park

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents