Similar Projects
Camera Refresh
Term Contract
Sub-Bidding
Minneapolis, MN 55415

LED Lighting Supplies
Infrastructure
Post-Bid

Concord Lighting Upgrades
Alteration
Post-Bid
Edina, MN

Recreation Center Solar Panel Installation
Alteration
Results
$485,000 est. value
Edina, MN 55416

2022 Osseo Senior High East Wing LTFM
Alteration
Results
$4,000,000 est. value
Osseo, MN 55369

Solar Power System Design and Installation
Alteration
Post-Bid

50th Street West and Broadway Street Northeast Signal - Pedestrian Improvements and Fiber
Alteration
Results
$175,000 est. value
Minneapolis, MN 55467

Traffic Signal Cable
Infrastructure
Post-Bid
Minneapolis, MN

Schneider Theatre Lighting System
Alteration
Results
Bloomington, MN 55431

Minneapolis Solar
Alteration
Post-Bid
Minneapolis, MN

2022 Electrical Infrastructure Program P13
Alteration
Results
MN

2022 District Wide LED Lighting
Alteration
Post-Bid
Brooklyn Park, MN 55429

Electrical Switchgear Replacements (STH)
Alteration
Results
Minneapolis, MN

Solar Power System Design and Installation Master
New Construction, Infrastructure
Post-Bid

2022 Lucy Laney Lighting Upgrades
Alteration
Results
Minneapolis, MN 55412

Last Updated 03/19/2023 04:04 AM
Project Title

Cornelia Elementary 2023 Lighting Upgrades

Physical Address View project details and contacts
City, State (County) Edina, MN 55435   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $189,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Make proposals on bid forms in Project Manual, submit a certified check or bidder's bond payable to the District in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond and Performance Bond. No bidder may withdraw his/her bid within thirty (30) days after the date of opening bids without the consent of the Board of Education. Independent School District #273 reserves the right to reject any or all bids and to waive informalities in bidding or advertisement; also to select the bid which bet meets the needs of the District pursuant to M.S. 471.6161, subd.3. Work under this Contract includes: 1. Electrical Systems a. Electrical service, switchgear, distribution panels, conduit and wiring. b. Interior and exterior lighting. c. Ceiling finishes of acoustical lay-in tile, salvaged and reinstalled as needed for electrical work. 2. Keep Architect fully informed about progress of the work, performance of the work and potential problems. 3. The Owner will hold a ground breaking at the start of construction. The Contractor is responsible to supply 20 new hard hats and 20 new shovels for the participants.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents