Similar Projects
Last Updated | 12/18/2023 02:11 PM |
Project Title | Bruce B Downs Boulevard Apartments |
Physical Address | View project details and contacts |
City, State (County) | Wesley Chapel, FL 33544 (Pasco County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Residential |
Sub-Category(s) | Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s) |
Contracting Method | Bids by Invitation |
Project Status | Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $23,564,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | https://www.bizjournals.com/tampabay/news/2023/12/15/tampa-bay-best-real-estate-deals-multifamily-2023.html Mast Capital's 248-unit Wesley Chapel project Mast Capital Wesley Chapelexpand A rendering of Mast Capital's unnamed 248-unit apartment complex in Wesley Chapel MAST CAPITAL Miami-based Mast Capital is building a 248-unit apartment complex at 5101 Bruce B. Downs Blvd. in Wesley Chapel. It began construction in late 2022. Developer: Mast Capital General contractor: First Florida Lender: Texas Capital Bank Inside the deal: "We engaged with the seller, a large local hospital system, in early February 2020 and reached and executed a letter of intent on March 9, 2020. Only a short time later, the seller's priorities would change dramatically. The purchase and sale contract discussions would take a back seat to the pressing need for the hospital to react definitively to the global pandemic. Ultimately, the hospital was wonderful to work with throughout this time, and both sides were happy to kick off formal diligence of the opportunity in June 2020," Mast Capital said. "Prior to diligence, we were aware that multiple developers had tried to figure out the impact of the site conditions that existed at the property but were either reluctant to take on the perceived risk or didn't spend the time or resources to fully grasp the potential. We loved the location from the start, and we knew that BayCare Hospital was moving forward with its new hospital adjacent to the site. We were comfortable in trying to fully understand the amount of de-mucking, wetland mitigation and importing of fill that may be required to stabilize the site in order to develop a luxury community that would integrate well within the fabric of Wesley Chapel. "Lastly, the site was zoned C-2, which would require public hearings and a majority vote from the county commissioners for a conditional use permit to allow residential development. The application was delayed given a continuation vote from the County Commissioners as they studied the amount of residential development being planned in the county. However, we were able to have a successful commission vote on our application just before a moratorium would be imposed on new land-use change applications for multifamily projects that ultimately spanned a year." _____________ The project is location on 16.24 acres at 4973 and 5101 Bruce B. Downs Boulevard. As of December 18, 2023 construction is underway. Information regarding the architect has not been disclosed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 86,000 SF.
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |