Similar Projects
UMASS Medical School Library Carpet Replacement
Post-Bid
Less than $160,000 est. value
Shrewsbury, MA 01545

Dance Floor System Replacement - Burncoat Middle School / WPS
Post-Bid
Worcester, MA

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Remove and Replace Rolled Carpet, Cove Base and VCT with Carpet Tile, Cove Base and VCT
Results
Less than $45,000 est. value
Clinton, MA

Removal and Replacement of the Existing Flooring
Post-Bid
Less than $22,000 est. value
Northborough, MA

Interior Finish Renovations at Maher Court - Filed Sub Bids
Renovation
Results
$311,100 est. value
Milford, MA 01757

Improve Existing Stairwells - General Bids
Post-Bid
Less than $140,000 est. value
Shrewsbury, MA

2019 Roof and Boiler Replacements - Filed Sub Bids
Results
$6,504,663 est. value
Worcester, MA 01604

Improve Existing Stairwells - Sub-Bids
Post-Bid
Less than $140,000 est. value
Shrewsbury, MA

Mid Rise Hallway Carpet Replacement
Results
$45,000 est. value
Clinton, MA 01510

Asbestos Abatement and Flooring and Ceiling Replacement
Post-Bid
Less than $115,000 est. value
Lunenburg, MA

High Rise Hallway Carpet Replacement Phase 2
Results
$45,000 est. value
Gardner, MA 01440

Furnishing and Installation of Vinyl Flooring Installation
Post-Bid
Worcester, MA

Remove Approximately 7,238 Sq Ft of Floor Tiles
Results
$35,550 est. value
West Boylston, MA

Installation of New Carpet in Specified Areas
Post-Bid
Worcester, MA

Last Updated 06/16/2021 12:02 PM
Project Title

Remove and Replace Existing Vinyl Stair Treads

Physical Address View project details and contacts
City, State (County) North Brookfield, MA 01535   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,926
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: The work consists of the removal of rubber treads and risers, and the installation of new rubber treads and risers. It includes an alternate for the installation of new handrails and guard rails, and a second alternate for painting

Details

Division 02 - Existing Conditions, Demolition.
Division 05 - Metals, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 09 - Finishes, Flooring, Resilient Flooring, Painting, Interior Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents