Similar Projects
Two Lane Resurfacing - HAN/ALL-US 224/SR 103-05.25/01.79
Bidding
Bluffton, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

Minor Reconstruction - US 68-04.70 Arlington Phase 2
Results
Arlington, OH 45814

Spot Patching / Pavement Repair - CPR FY20
Results
Findlay, Van Buren, OH 45889

Minor Reconstruction - US 68-05.37 Arlington Phase 3
Results
Arlington, OH 45814

2020 Annual Street Resurfacing Program Contract A- Concrete Project
Results
Less than $757,000 est. value
Findlay, OH

2020 Annual Street Resurfacing Program Contract B-Asphalt Project
Results
Less than $491,000 est. value
Findlay, OH

Blanchard Street Catch Basin Replacement
Results
Less than $150,000 est. value
Findlay, OH

Township Chip Seal 2020
Results
Less than $467,494 est. value
OH

County/ Township Local Resurfacing 2020
Results
Less than $2,539,471 est. value
OH

County/ Township OPWC Resurfacing 2020
Results
Less than $1,548,670 est. value
OH

Asphalt Resurfacing
Results
OH

Two Lane Resurfacing - /HAN/All-US 224/SR 103-VAR
Results
Bluffton, Ottawa, OH 45817

Microsurfacing - Micro-FY21
Results
Clinton, Franklin, Goshen, Jackson, Jackson Center, Van Buren, OH 44216

Crack and Joint Sealant (MBE Only)
Term Contract
Results

Last Updated 05/19/2020 03:48 PM
Project Title

County Road 236 Widening

Physical Address View project details and contacts
City, State (County) Findlay, OH 45840   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,196,661
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Widening out County Road 236 one lane to the east from Sandusky St. (SR568) to Tiffin Ave. (US224) as well as installing a multiuse path on the east side of the right of way. The widening of County Road 236 will reconfigure the roadway to a three lane road consisting of two drive lanes and a center turn lane. Along with the roadway widening a new 10 ft. wide multiuse path will be installed on the east side of the roadway from Sandusky St. to Tiffin Ave. New curb and gutter will be placed on this section of roadway, which will also include the relocation of existing storm structures. This project consist of, but not limited to; installing 2,450 SF of concrete sidewalk, 56,860 SF of asphalt multiuse path, 1208 CY of Asphalt Concrete Surface Course, 514 CY Asphalt Concrete Intermediate Course, aggregate base, new storm lines and structures, and grading and seeding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents