Similar Projects
East Fork Pedestrian Bridge
Post-Bid
$1,063,855 est. value
Jamestown, NC

Intersection and Parking Lot Improvements
Post-Bid
High Point, NC

Keeley Park Mountain Bike Trail Project
Results
Greensboro, NC

Highway 150 Walkway Improvements
Results
Oak Ridge, NC

Lewis Community Center - Civil ADA Upgrades
Post-Bid
Greensboro, NC 27455

Friendly Avenue Sidewalk Improvements Part A
Results
Greensboro, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

English Street Sidewalks
Results
Greensboro, NC

Concrete Sidewalk Repair
Post-Bid
Greensboro, NC

2019 Resurfacing Curb Ramps Installation
Results
Greensboro, NC

Latham Park Greenway
Post-Bid
Greensboro, NC

Lindsay Street and Holden Road Sidewalk Improvements Safe Routes to School
Results
Greensboro, NC

Resurfacing Streets Part 2
Post-Bid
Greensboro, NC 27401

General Sidewalks Improvements
Results
Greensboro, NC

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Reported 07/16/2019 12:00 AM
Project Title

Sidewalk Enhancement Project, East Main Street Sidewalk

Physical Address View project details and contacts
City, State (County) Jamestown, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description Construction of EB-5519, WBS Element#50035.3.1, STPEB - 0712(4), CFDA# 20.205 - Sidewalk Enhancement Project, East Main Street Sidewalk, consisting of, but not limited to, the following approximate quantities: 600 square yards of concrete sidewalk 1,300 square yards of brick sidewalk 3,000 feet of 30" concrete curb and gutter (alternate bid adds 1,400 if) 2,100 linear feet of 15" to 18" RCP (alternate bid adds 150 If) 24 drainage structures (alternate bid adds 7 structures) 300 tons of asphalt (alternate bid adds 120 tons) 400 feet of steel beam guardrail, including 4 GREU's
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents