Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Cornelia Drive from CR 78 to Northern Terminus Road Resurfacing Improvements & Crescent Avenue SW Roadway Improvements from CR 78 North to Everett St SW
Infrastructure
Bidding
$363,000 CJ est. value
Moore Haven, FL 33471

Cornelia Drive from CR 78 to Northern Terminus Road Resurfacing Improvements & Crescent Avenue SW Roadway Improvements from CR 78 North to Everett St SW
Infrastructure
Bidding
$363,000 CJ est. value
Moore Haven, FL 33471

RFP Engineering - I-4 at US 27 (SR 25); I-4 at US 27 Backage Road
Infrastructure
Post-Bid
$7,438,700 CJ est. value
Orlando, FL 32819

RFP Engineering - I-4 at US 27 (SR 25); I-4 at US 27 Backage Road
Infrastructure
Post-Bid
$7,438,700 CJ est. value
Orlando, FL 32819

Silicone Joint Sealer
Infrastructure
Results

Asphalt Milling and Resurfacing
Infrastructure
Results
$400,000 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Herbert Hoover Dike (HHD), County Road 720 Milling and Resurfacing, Glades County
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Moore Haven, FL 33471

RPM Replacement and Removal
Infrastructure
Results
$40,000 est. value

RFQ D/B - New Lock Control Building and Associated Upgrades at Ortona Lock and Dam
New Construction, Infrastructure - 1,343 SF
Post-Bid
$5,000,000 CJ est. value
Moore Haven, FL 33471

Resurfacing
Infrastructure
Results
$9,301,764 est. value
Moore Haven, FL 33471

Glades County Us Hwy#27 Utility Corridor Infrastructure East Side Sewer Addition
Infrastructure
Results
$1,992,246 CJ est. value
Moore Haven, FL 33471

Last Updated 12/28/2023 05:31 AM
Project Title

Herbert Hoover Dike Pump Stations S-4 and S-131 Stilling Well Replacements

Physical Address View project details and contacts
City, State (County) Moore Haven, FL 33471   (Glades County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 11/28/23
Owner View project details and contacts
Architect View project details and contacts
Description

A Pre-Proposal Conference will be held on Thurday, 14 December 2023 from 10:00am - 11:00am, EST via teleconference. The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 2760 191 1746. It is requested that an email be sent to rasheedah.s.sneeze@usace.army.mil to confirm attendance by your organization. A Pre-Proposal Conference will be held on Thurday, 14 December 2023 from 10:00am - 11:00am, EST via teleconference. The meeting invitation link is: https://usace1.webex.com/usace1/j.phpMTID=mb1d171bd452770d02f9bf0deff3b25be Description of Work The work is located at the Pump Station S-4 and Pump Station S-131 site(s) respectively. Pump Station S-4 is located on the south side of Lake Okeechobee between Clewiston Florida and Moore Haven Florida in Glades County. Pump Station S-131 is located on the north side of Lake Okeechobee east of Lakeport Florida in Glades County. Each pump station pumps water from the landside of Herbert Hoover Dike (HHD) into Lake Okeechobee. Construction includes fabricating a metal walkway, installing pre-stressed concrete piles, installing below and above grade electrical conduit, constructing a concrete walkway, acquiring, and installing stilling well instrumentation, and running data cable from the stilling well to the onsite control building. The pile supported metal walkway extends from the lakeside toe of HHD into Lake Okeechobee where a stilling well and all associated instrumentation will be installed. Data cables from the stilling well will be routed along the metal walkway to HHD where conduit will transition from above grade to below grade from the metal walkway to the onsite control building. A concrete sidewalk will be installed from the metal walkway to nearby asphalt pavement. A South Florida Water Management District (SFWMD) Right-of-Way permit will be required prior to construction. This contract will have a period of performance of 154 calendar days after notice to proceed. In accordance with FAR 36.204 -- Disclosure of the Magnitude of Construction Projects, the magnitude associated with this requirement is between $1,000,000.00 and $5,000,000.00. NAICS 237990 Small Business Size Standard $45,000,000. THIS IS A TOTAL SMALL BUSINESS SET-ASIDE ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents