Last Updated | 12/28/2023 05:31 AM |
Project Title | Herbert Hoover Dike Pump Stations S-4 and S-131 Stilling Well Replacements |
Physical Address | View project details and contacts |
City, State (County) | Moore Haven, FL 33471 (Glades County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 11/28/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A Pre-Proposal Conference will be held on Thurday, 14 December 2023 from 10:00am - 11:00am, EST via teleconference. The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 2760 191 1746. It is requested that an email be sent to rasheedah.s.sneeze@usace.army.mil to confirm attendance by your organization. A Pre-Proposal Conference will be held on Thurday, 14 December 2023 from 10:00am - 11:00am, EST via teleconference. The meeting invitation link is: https://usace1.webex.com/usace1/j.phpMTID=mb1d171bd452770d02f9bf0deff3b25be Description of Work The work is located at the Pump Station S-4 and Pump Station S-131 site(s) respectively. Pump Station S-4 is located on the south side of Lake Okeechobee between Clewiston Florida and Moore Haven Florida in Glades County. Pump Station S-131 is located on the north side of Lake Okeechobee east of Lakeport Florida in Glades County. Each pump station pumps water from the landside of Herbert Hoover Dike (HHD) into Lake Okeechobee. Construction includes fabricating a metal walkway, installing pre-stressed concrete piles, installing below and above grade electrical conduit, constructing a concrete walkway, acquiring, and installing stilling well instrumentation, and running data cable from the stilling well to the onsite control building. The pile supported metal walkway extends from the lakeside toe of HHD into Lake Okeechobee where a stilling well and all associated instrumentation will be installed. Data cables from the stilling well will be routed along the metal walkway to HHD where conduit will transition from above grade to below grade from the metal walkway to the onsite control building. A concrete sidewalk will be installed from the metal walkway to nearby asphalt pavement. A South Florida Water Management District (SFWMD) Right-of-Way permit will be required prior to construction. This contract will have a period of performance of 154 calendar days after notice to proceed. In accordance with FAR 36.204 -- Disclosure of the Magnitude of Construction Projects, the magnitude associated with this requirement is between $1,000,000.00 and $5,000,000.00. NAICS 237990 Small Business Size Standard $45,000,000. THIS IS A TOTAL SMALL BUSINESS SET-ASIDE ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |