Similar Projects
Environmental Services IDIQ
Design

Environmental Services IDIQ
Design

Environmental Water Monitoring Services
Term Contract
Post-Bid
Kissimmee, FL 34741

Asbestos Abatement
Post-Bid
Jacksonville, FL 32208

2019 Apartment Emergency Rehabilitation Services
Renovation
Results
Less than $1,700 est. value
Ocala, FL 34471

Various Residential/Commercial Lot Cleanup Abatement Projects
Results
Pensacola, FL

Asbestos Bulk Analysis and Air Sample Testing
Term Contract
Post-Bid
Less than $20,000 est. value
Tampa, FL 33601

3409 West 19th Street Asbestos Abatement
Results
Panama City, FL

9 Harrison Avenue Asbestos Abatement
Post-Bid
Panama City, FL 32401

Asbestos Testing
Results
Callaway, FL

MLK Recreation Center Asbestos Abatement and Flooring Removal
Post-Bid
Panama City, FL 32401

Mold Remediation and Air Quality
Results
Gainesville, FL 32641

Oakland Terrace Community Center Asbestos Abatement and Flooring Removal
Post-Bid
Panama City, FL 32401

Asbestos Abatement Services
Results
Saint Petersburg, FL 33731

Various Residential/Commercial Lot Cleanup Abatement Projects
Post-Bid
Cantonment, FL 32533

Reported 06/12/2021 12:00 AM
Project Title

Groundwater Monitoring Project

Physical Address View project details and contacts
City, State (County) (Brevard, Indian River, Volusia Counties)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Beginning in the 3rd quarter of 2021, the contractor will sample the seventy (70) monitoring wells located on the subject sites on a quarterly basis for three (3) years. The sampling will be conducted under Florida Department of Environmental Protection, Standard Operating Procedures (FDEP-SOP001/01), FS-2200 for groundwater sampling. The sampling analysis will consist of chloride, pH, TDS, and turbidity. Samples are to be collected via peristaltic pump. A field sampling data sheet will be prepared for each well sampled that will include depth to water and a calculation of well volume for purging. One field equipment blank and one duplicate sample will be taken during each quarterly sampling round in order to meet Quality Assurance/Quality Control (QA/QC) requirements. Each sample will be analyzed by a state certified testing laboratory in accordance with the following: EPA Method 300 for dissolved chloride, EPA Method 150.1 for pH. EPA Method 160.1 for TDS, and EPA Method 180.1 for turbidity. A Chain of Custody form will be completed properly identifying sample locations, sample type, sampler, etc. Quarterly results will be reported in a cumulative table. Original copies of laboratory data and field sampling sheets will be attached to the quarterly report. The District requires the report be submitted within 15 days of completion of sampling. All reports will be submitted to the District in electronic format, not printed format. The District may also require specific standardized forms be used in reporting the well data which will be supplied.

Details

Division 01 - General Requirements, Quality Assurance, Field Samples, Quality Control.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents