Similar Projects
OR 241: Chandler (Coos River) Bridge
Infrastructure
Design
$4,262,000 CJ est. value
Coos Bay, OR 97420

OR 241: Chandler (Coos River) Bridge
Infrastructure
Design
$4,262,000 CJ est. value
Coos Bay, OR 97420

2023 Streets Project - Eastside Roads
Infrastructure
Bidding
$2,000,000 CJ est. value
Coos Bay, OR 97420

2023 Streets Project - Eastside Roads
Infrastructure
Bidding
$2,000,000 CJ est. value
Coos Bay, OR 97420

Coos Bay Bridge Cleaning and Brushing Services
Term Contract
Post-Bid
North Bend, Umpqua, OR 97459

Water System Improvements
Infrastructure
Post-Bid
$250,000 CJ est. value
Myrtle Point, OR 97458

Highway 101 Inversion Lining Project
Alteration
Results
$125,000 to $155,000 est. value
Coos Bay, OR 97420

Reconstruct and Expand Apron - Phase 1
Infrastructure
Results
$6,070,887 CJ est. value
North Bend, OR 97459

Bandon Beach Hotel
Demolition, New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Bandon, OR 97411

Powers-Agness Hwy: Burma Slide Sec (MP4.4-8.4)
Infrastructure
Design
$13,657,312 CJ est. value
Myrtle Point, OR 97458

RFP Construction Manager - South Coast Regional Seismic Ready Facility CM/GC Services
New Construction, Infrastructure
Bidding
$45,000,000 CJ est. value
Fairview, OR 97423

Landscape Maintenance Services
Term Contract
Post-Bid
Bandon, OR 97411

OR542 Curb Ramps Project on the Powers Highway (Rt. No. OR542) in Powers
Infrastructure
Results
OR

2023 Streets Project Eastside Roads
Demolition, Infrastructure
Bidding
$220,000 CJ est. value
Coos Bay, OR 97420

RFQ Design - Conceptual Design and Siting of the Proposed Coos Bay Library at Topits Park
New Construction, Infrastructure
Post-Bid
$18,600,000 CJ est. value
Coos Bay, OR 97420

Last Updated 07/25/2023 03:29 PM
Project Title

Third Street Improvements

Physical Address View project details and contacts
City, State (County) Powers, OR 97466   (Coos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $108,861 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, materials and supervision for the construction of 175 ft of curb, gutter and 6-ft wide sidewalk, 1 ADA ramp, 2 ADA access locations, storm drain improvements and asphalt restoration along Third and Fir Streets at City Hall. Bid alternatives includes additional curb, gutter and sidewalk improvements as well as additional AC street parking and will be awarded if funds are available. Restriping is required. The City will provide an archeological monitor.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents