Similar Projects
Pavement Preservation
Infrastructure
Bidding
AZ

City Of Buckeye Sewer, Water and Street Improvements
Infrastructure
Bidding
$965,000 est. value
Buckeye, AZ

Concrete Slope Paving at 2 Locations
Post-Bid
Window Rock, AZ 86515

Intersection Improvement Services Job Order Contract
Post-Bid
$5,000,000 est. value
Phoenix, AZ 85003

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Y--Church Camp and Saddleback Mountain Recreational Shooting Sites
Results
$2,500,000 to $3,000,000 est. value
Phoenix, AZ

Mill and Replace With Bonded Overlay and Partial Rehab
Infrastructure
Bidding
$5,200,000 est. value
AZ

Sources Sought Indefinite Delivery, Indefinite Quantity Contract (IDIQ) to Support The Directorate of Public Works (DPW) at Fort Huachuca: Paving & Road Repair
Post-Bid
Fort Huachuca, AZ

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

Pavement Preservation
Infrastructure
Bidding
AZ

AZ FLAP 202(2) Red Cloud Mine Road
Post-Bid
$1,500,000 to $2,500,000 est. value
Yuma, AZ

Avra Valley Pavement Reconstruction Project - Phase 2
Results
Less than $2,000,000 est. value
Marana, AZ

N6486 Kayenta Chapter Road Maintenance Project
Infrastructure
Bidding
Kayenta, AZ 86033

2020-2021 General Construction Services
Post-Bid
Phoenix, AZ

Freeway Widening
Results
Less than $36,200,000 est. value
Peoria, AZ 85345

Last Updated 02/14/2022 05:14 AM
Project Title

Shoulder Widening

Physical Address View project details and contacts
City, State (County) AZ   (Apache County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,066,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed shoulder widening project is located in Apache County on US 191 from Chinle to Black Mountain Wash, south of Many Farms from MP 448.22 to MP 460.36 within the limits of the Navajo Nation. The work consists of widening the existing shoulder on both sides of the roadway and installing shoulder and centerline rumble strips. The work also includes chip seal application, paving turnouts, installing pipe, headwalls and guardrail, signing, pavement markings and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents