Similar Projects
Last Updated | 11/21/2019 04:58 PM |
Project Title | Municipal Building HVAC Retrofit Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Barre, VT (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace the two poorly-operating circulator pumps, leaving the third functional pump as the spare. The two existing air conditioning systems to be replaced are 5-ton split systems. New equipment shall meet or exceed Vermont 2015 Commercial Building Energy Standards (CBES) for equipment of this type. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |