Similar Projects
Kaw Lake Water Supply Program
Alteration
Bidding
$2,000,000 est. value
Enid, OK

Apache Tribe of Oklahoma, Silver Buffalo Casino and Food Distribution Building Parking Lot Project
Alteration
Bidding
$1,000,000 est. value
Anadarko, OK 73005

Storm Drain Repairs
Infrastructure
Post-Bid
Oklahoma City, OK 73104

Quaker Avenue Storm Sewer Realignment
Infrastructure
Post-Bid
Tulsa, OK

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Results
Moore, OK

Construction for Sewer Force Main Improvements
New Construction, Infrastructure
Results
Moore, OK 73165

Bixby Public Schools Academic Building - Earthwork and Storm Sewer
Infrastructure
Bidding
$130,000 est. value
Bixby, OK 74008

Storm Drain Cleaning
Infrastructure
Post-Bid

Lions Avenue Drainage Improvements
Infrastructure
Results
Less than $416,060 est. value
Broken Arrow, OK

Canterbury Avenue Storm Sewer Replacement
Infrastructure
Bidding
$300,000 est. value
Muskogee, OK 74403

Hominy Municipal Lake Siphon
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Hominy, OK

Charlotte Terrace and Heights Drive Drainage Improvements
Infrastructure
Results
Mustang, OK

Aspen Ridge Norfolk Drive
Infrastructure
Results
$2,984,324 est. value
Broken Arrow, OK 74011

Wastewater Collection System Improvements
Infrastructure
Results
$36,000 est. value
Jones, OK

CDBG Needles Storm Sewer Improvement Phase II
Infrastructure
Results
Bixby, OK

Reported 05/25/2022 08:39 AM
Project Title

Aspen Ridge Storm Drain

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Broken Arrow, Oklahoma. Working plans call for site work for a water / sewer project. The project was not bid and is on hold. The project is located in the southeast quadrant of section 04, Township 17N, Range 14E, and is located at approximately 2244 West Charlotte Street South, in the Aspen Ridge Subdivision. Project SW21080, Aspen Ridge Storm Drain Project, will consist of constructing an 8" inch storm drain line for storm water from several back yards due to inadequate drainage caused by a rock retaining wall. This is located in the Aspen Ridge Subdivision, west of Aspen Avenue, between Tucson St. and Jasper St. The total linear feet of storm drain installed is 115 feet and includes 4 storm inlets. The project is located in the southeast quadrant of section 04, Township 17N, Range 14E, and is located at approximately 2244 West Charlotte Street South.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents