Similar Projects
Reported | 07/23/2021 12:00 AM |
Project Title | West Lea Subdivision Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Pearland, TX (Brazoria County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project area is bounded by Manvel Road, Bailey Road, Brazoria Drainage District 4 ditch, and Mary’s Creek. The project will entail the construction of drainage improvement infrastructure within the entire West Lea Subdivision and along Manvel Road (FM 1128) to the Mary’s Creek outfall. The project includes the removal of existing storm sewer, installation of approximately 10,500 LF of proposed storm sewer, re-grading, widening, and re-shaping approximately 40,500 LF of roadside ditch, utility adjustments, installation of street light conduit, the removal and replacement of driveway culverts, upsizing of culverts, tree removal and protection, sidewalk and pavement repair, and site restoration. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |