Similar Projects
HPW - Lift Station Renewal And Replacement
New Construction, Renovation
Bidding
$9,921,000 est. value
Houston, TX

Alvin ISD High School Lift Station
New Construction
Bidding
Alvin, TX 77511

Stringfellow Unit - Replace Pumps and Controls - Pump House #0383
Post-Bid
Rosharon, TX 77583

Storm Sewer Pump Station to Serve Mustang Ridge
Post-Bid
Alvin, TX 77511

42" Gravity Outfall Twin Lakes Boulevard
Results
TX

Lift Station No. 5 and 13 Rehabilitation and Sewer Line Replacement
Results
$360,000 est. value
Freeport, TX 77541

Reconstruction of Royal Oaks Lift Station
Post-Bid
Pearland, TX

Construction of the Lift Station No. 3 Phase 2
Results
TX

Miller Ranch Road Regional Lift Station Rehabilitation
New Construction
Post-Bid
Pearland, TX 77584

Cullen Regional Lift Station Rehabilitation
Results
Less than $768,600 est. value
Pearland, TX

Riverwalk Lift Station Reconstruction
Results
Less than $408,700 est. value
Pearland, TX 77581

Lift Station 30 Expansion and Highway 35 Bypass Gravity and Force Mains
Results
Alvin, TX 77511

Lift Station No. 1
Results
TX

Windrose Green Lift Station No. 1
Results
TX

42" Gravity Outfall - East Pump Station
Results
West Columbia, TX 77486

Last Updated 04/21/2021 03:47 PM
Project Title

Lift Station No. 3 Modifications

Physical Address View project details and contacts
City, State (County) Houston, TX   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. One (1) 20 HP non-clog submersible sewage pump, guide rails and accessories 2. Discharge piping, valves, fittings, appurtenances and protective coatings 3. Blast and coat pipe, fittings and concrete surfaces of existing lift station wet well 4. Electrical controls and modifications 5. Replacement of 2 impellers in existing pumps 6. Bypass pumping.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents