Similar Projects
Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Ashley Avenue Drainage Project
Post-Bid
Less than $80,000 est. value
Marion, SC 29571

Calhoun Avenue Drainage Project
Post-Bid
Spartanburg, SC

Runway 20 Obstruction Removal
Results
Less than $196,000 est. value
Rock Hill, SC

Northgate/Cobb Road Storm Drainage Rehabilitation
Results
Greenwood, SC

FSR 3010 EROSION REPAIRS
Post-Bid
$25,000 to $100,000 est. value
Edgefield, SC

Animal Control Drain Line Repairs
Results
Newberry, SC

Woodcreek Pipe Relocation
Post-Bid
Conway, SC 29528

Benson Campus Under Road Drain Repair
Results
$15,000 to $17,000 est. value
Taylors, SC 29687

Charleston District USACE Industry Day for FY20 and FY21 Civil Works Diking Projects
Post-Bid
Charleston, SC 29403

Drainage Improvements Project at Bryson Elementary School
Results
Simpsonville, SC 29681

Washout Revetment Rebuild/Repair
Post-Bid
Folly Beach, SC 29439

Mathis Road Culvert Replacement
Results
Greenwood, SC

Trench Box-FA
Post-Bid
SC

Thornwood Drive Culvert Project
Results
Spartanburg, SC

Last Updated 04/07/2020 11:09 AM
Project Title

Detention Pond Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance and repair of Richland County owned detention ponds, ditches, water quality units, and curb screens. The goal is to properly maintain and repair our detention ponds to allow retaining larger flows and thus reduce the peak runoff rates downstream and to assist in providing necessary storage volumes during larger storm events and removing certain pollutants. To mitigate the increase risk of flooding downstream, increase instability of downstream channels that may lead to aesthetic and nuisance problems; clear the cause of unpleasant odors, nuisance insects, and algae blooms; clearing of generally unsightly and unkempt area.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents