Similar Projects
Centerville Highway Self Storage
New Construction - 99,960 SF
Conception
$10,800,000 est. value
Snellville, GA 30039

Radium Springs Storage Solutions
New Construction - 36,800 SF
Conception
Albany, GA

Doka
Addition - 1,100 SF
Design
$750,000 est. value
Lawrenceville, GA

FR Estate - Mixed Use
New Construction - 35,719 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Suwanee, GA 30024

PCS West Property Development
New Construction
Bidding
Garden City, Port Wentworth, GA 31407

Wastewater Treatment Plant Pole Barn
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Stockbridge, GA 30281

MCBOE Facilities Department
New Construction - 15,000 SF
Post-Bid
Chatsworth, GA 30705

Construction Services for an IDC Building
New Construction
Post-Bid
Warner Robins, GA 31093

Truck Shed Repair
Results
$66,500 est. value
Dalton, GA 30721

Turf Maintenance Building for South Forsyth High School
New Construction - 1,539 SF
Results
Less than $270,000 est. value
Cumming, GA 30041

Fairburn Road Storage
Renovation - 75,600 SF
Construction
$977,600 est. value
Atlanta, GA 30331

Gwinnett Climate Controlled Self Storage
Addition - 40,000 SF
Construction
$2,200,000 est. value
Lilburn, GA 30047

150 Royal Woods Court
Renovation - 71,000 SF
Pending Verification
Tucker, GA 30084

Kennesaw Storage
New Construction - 102,144 SF
Pending Verification
$10,000,000 CJ est. value
Kennesaw, GA 30144

Better Baseball Two
New Construction - 15,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Marietta, GA 30060

Last Updated 10/27/2022 09:01 PM
Project Title

AGS Fuel Farm Improvements

Physical Address View project details and contacts
City, State (County) Augusta, GA 30904   (Richmond County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,898,895 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing: Bid Item #22-244 AGS Fuel Farm Improvements for Augusta, GA Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Wednesday, September 21, 2022 @ 5:00 P.M. No proposal may be withdrawn for a period of ninety (90) days after BIDs have been opened, pending the execution of contract with the successful vendor. A 10% Bid Bond is required. A 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on Georgia public contract (contracts with a government agency) for the physical performance of services over $2,499 in value to enroll in E-Verify, regardless of the number of employees. They may be exempt from this requirement if they have no employees and do not plan to hire employees for the purpose of completing any part of the public contract. Certain professions are also exempt. All requests for proposals issued by a city must include the contractor affidavit as part of the requirement for their bid to be considered. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. No bid will be accepted by fax or email, all must be received by mail or hand delivered. MBE (27.2%), WBE (6.9%), SBE (4%) Work Area 1. Scope ofWork -Rehabilitation ofthe Fuel Farm Facility, mcludmg, but not limited to the installation offour (4) new 30,000 gallon Double-Walled Horizontal Jet A Fuel Tanks andassociated containment pad, foundations, piping, pumps, etc., rehabilitation ofthe existing Mogas, Diesel, and LL-100 tanks and piping, installation of a new 16' x 20' testing building, installation of approximately 1100 LF of new perimeter fence, installation ofnew vehicle gate and card reader, installation ofnew lighting and security devices, Duration - 55 Calendar Days Work Area - G-083 in the Construction Plans. Work Area 2. Scope ofWork - Rehabilitation ofthe Fuel Farm Facility, including, but not limited to the demolition and removal ofthe four (4) existing vertical Jet-A Tanks containment pad, foundations, piping, pumps, etc., the demolition and removal of one (1) existing horizontal Jet-A Tank and associated foundations, piping, pumps, etc., and the demolition of approximately 1150 LF of existing perimeter fence. Duration - 30 Calendar Days Work Area - G-084 in the Construction Plans Work Area 3. Scope ofWork -Rehabilitation ofthe Fuel Farm Facility, including, but not limited to the demolition and full depth rehabilitation of approximately fourteen hundred (1400) SY of existing asphalt pavement and the placement of approximately four hundred (400) tons of new asphalt pavement for the new access loop road. Duration -- 14 Calendar Days Work Area - G-085 in the Construction Plans. Work Area 4. Scope ofWork-Rehabilitation ofthe Fuel Farm Facility, including, but not limited to the relocation and repurposing ofthe existing horizontal Jet-A Tank to the ARFF training circle. Duration - 5 Calendar Days Work Area - G-086 in the Construction Plans

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents