Similar Projects
Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Sanitary Sewer Capacity Improvements
Results
Less than $15,000,000 est. value
Saint Pete Beach, FL 33706

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

City-Wide Rehabilitation of the Sanitary Sewer System
Results
$544,555 to $1,319,648 est. value
North Miami, FL 33161

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Grease Trap, Septic Tank and Storm Drainage Pump-Out and Repair Services
Term Contract
Results
Miami, FL

SR 20 Forcemain Upgrade - Lafayette L.S. to South Jackson Street and US-331 Forcemain Repair at Jolly Bay Road
Post-Bid
Santa Rosa Beach, FL

Greenboro Forcemain Replacement Project
Results
$649,000 est. value
West Melbourne, FL 32904

Glades County Community Development Block Grant Project Washington Park Sanitary Improvements
Post-Bid
$550,000 est. value
FL

Maintenance of Stormwater and Sanitary Sewer Structures
Results
Less than $150,000 est. value
North Miami, FL 33161

US-98 Sanitary Force Main Improvements
Post-Bid
$600,000 to $700,000 est. value
Sebring, FL 33876

Sanitary Sewer Cleaning and CCTV
Results
Less than $110,000 est. value
Miami, FL 33155

Pipeline Pig Service
Post-Bid
Less than $210,000 est. value
Tampa, FL 33601

Last Updated 04/23/2021 08:38 AM
Project Title

Church Avenue Force Main

Physical Address View project details and contacts
City, State (County) Dade City, FL 33525   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 1290 linear feet of new, 6-inch force main with all associated valves and fittings on Church Avenue between SR 52 and 17th Street. Work involves connection to the existing 6-inch PVC force main on SR 52 with new C-900 PVC pipe, approximately 1200 linear feet of directional boring with new, 6-inch HDPE pipe and connection to the existing manhole on 17th Street with new C-900 PVC pipe installed through conventional trenching

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents