Similar Projects
Metro Chrysler Jeep Ram Dealership Addition
Addition, Demolition, Infrastructure, Renovation - 3,780 SF
Conception
$600,000 CJ est. value
Chicopee, MA 01020

Metro Chrysler Jeep Ram Dealership Addition
Addition, Demolition, Infrastructure, Renovation - 3,780 SF
Conception
$600,000 CJ est. value
Chicopee, MA 01020

Holyoke- Bridge Replacements, H-21-014, Route 141 (Appleton Street) Over Second Level Canal & H-21-020 Over First Level Canal
New Construction
Design
$9,130,000 est. value
Holyoke, MA 01040

Chicopee-Baskin Redevelopment
New Construction, Infrastructure - 162,000 SF
Design
$40,000,000 CJ est. value
Chicopee, MA 01013

RFP - Purchase and Redevelopment of Vacant Lots in the Pine Point Neighborhood
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Springfield, MA 01103

RFQ D/B - Replace Dormitory Windows at the Westover Job Corps Center
Term Contract, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Chicopee, MA 01022

Holyoke Soldiers Home - Renovation/Replacement
Term Contract, Demolition, New Construction, Renovation, Infrastructure - 548,415 SF
Post-Bid
$328,660,000 CJ est. value
Holyoke, MA 01040

Pine Hill Road Drainage Improvements
Infrastructure
Post-Bid
$672,000 est. value
Russell, MA

Road Resurfacing and Related Work 2021
Results
$942,861 est. value
Wilbraham, MA

Resurfacing and Related Work (High Friction Surface Treatment Application) at Various Locations
Infrastructure
Results
$2,305,229 est. value

Holiday Inn Express
Demolition, New Construction, Infrastructure - 63,735 SF
Pending Verification
$19,000,000 CJ est. value
West Springfield, MA 01089

Holiday Inn Express
Demolition, New Construction, Infrastructure - 63,735 SF
Pending Verification
$19,000,000 CJ est. value
West Springfield, MA 01089

White Hut / Holyoke
Renovation, Infrastructure
Conception
$200,000 CJ est. value
Holyoke, MA 01040

Sidewalk Replacement
Infrastructure
Design
$719,000 CJ est. value
Longmeadow, MA 01106

Wilbraham Country Club Cart Path
Alteration
Post-Bid
$50,000 est. value
Wilbraham, MA 01095

Last Updated 12/20/2022 09:03 AM
Project Title

Trolley Trail East Pedestrian Bridge Project

Physical Address View project details and contacts
City, State (County) Brimfield, MA 01010   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $413,000 [brand] Estimate
Plans Available from Agency's Affiliate - 10/13/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project is to construct the north and south abutments for a 100 pedestrian bridge to cross the Quinebaug River including pile installation, reinforced concrete footing, abutment, and wing walls. solicitation-7456-160330, 15.0166527.00 The intent of the Contract is to prescribe the complete work or improvement. The Contractor shall perform all the items of work stipulated in the Proposal in accordance with the lines, grades, typical cross sections and dimensions shown on the plans or supplemental plans, standards, or modifications of them as required by change conditions in the field, and as authorized or directed. The Contractor shall do all clearing and grubbing; make all excavations and embankments; do all shaping and surfacing; construct all drainage structures, bridges and other appurtenant structures, as indicated in the Contract; remove all obstructions from within the lines of the improvement; and shall do such additional, extra and incidental work as may be considered necessary to complete the work in a substantial and acceptable manner; and when it is so completed they shall leave the work in a neat and finished condition. The Contractor shall do all the work and furnish all the materials, tools and appliances, except as otherwise specified, necessary or proper for performing and completing the work required by the Contract, in the manner and within the time specified. The Contractor shall complete the entire work to the satisfaction of the Engineer, and in accordance with the specifications and drawings for the work at the prices agreed upon.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents