Similar Projects
Last Updated | 12/20/2022 09:03 AM |
Project Title | Trolley Trail East Pedestrian Bridge Project |
Physical Address | View project details and contacts |
City, State (County) | Brimfield, MA 01010 (Hampden County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $413,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 10/13/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is to construct the north and south abutments for a 100 pedestrian bridge to cross the Quinebaug River including pile installation, reinforced concrete footing, abutment, and wing walls. solicitation-7456-160330, 15.0166527.00 The intent of the Contract is to prescribe the complete work or improvement. The Contractor shall perform all the items of work stipulated in the Proposal in accordance with the lines, grades, typical cross sections and dimensions shown on the plans or supplemental plans, standards, or modifications of them as required by change conditions in the field, and as authorized or directed. The Contractor shall do all clearing and grubbing; make all excavations and embankments; do all shaping and surfacing; construct all drainage structures, bridges and other appurtenant structures, as indicated in the Contract; remove all obstructions from within the lines of the improvement; and shall do such additional, extra and incidental work as may be considered necessary to complete the work in a substantial and acceptable manner; and when it is so completed they shall leave the work in a neat and finished condition. The Contractor shall do all the work and furnish all the materials, tools and appliances, except as otherwise specified, necessary or proper for performing and completing the work required by the Contract, in the manner and within the time specified. The Contractor shall complete the entire work to the satisfaction of the Engineer, and in accordance with the specifications and drawings for the work at the prices agreed upon. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |