Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

AZ FLAP 202(2) Red Cloud Mine Road
Design
$1,500,000 to $2,500,000 est. value
Yuma, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Zocalo Gardens Phases 2 and 3 Water Main and Roadway Improvements
Results
Somerton, AZ 85350

Highway 95 and Engler Avenue Intersection Improvements Project
Results
$900,000 est. value
Yuma, AZ 85365

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

County 16th Street to County 18th Street Intersection Improvements Project
Results
Yuma, AZ 85364

Pavement Rehabilitation
Results
Less than $17,500,000 est. value
Yuma, AZ 85364

Asphalt Sealant and Services
Term Contract
Results
Yuma, AZ

Pavement Preservation Services
Term Contract
Results
Less than $300,000 est. value
Yuma, AZ

AZ FTBR Levee Road (1) Pave Levee Road
Results
$1,000,000 to $2,000,000 est. value
Yuma, AZ 85364

Catalina Drive and Palo Verde Street Pavement Replacement
Results
Yuma, AZ

Cesar Chavez Avenue Reconstruction Project
Results
$1,000,000 to $1,300,000 est. value
Somerton, AZ

15th Street - Avenue A Intersection Improvement Project
Results
Less than $914,843 est. value
Yuma, AZ 85364

Last Updated 02/03/2020 10:22 AM
Project Title

AZ Flap 439(1) & 202(1), Martinez Lake & Red Cloud Mine Road

Physical Address View project details and contacts
City, State (County) Yuma, AZ   (Yuma County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

AZ Flap 439(1) & 202(1), Martinez Lake & Red Cloud Mine Road: Project consists of minor realignment and paving of approximately 6 miles of existing asphalt paved roadway and 2.1 miles of gravel roadway leading to Imperial National Wildlife Refuge within Yuma County, Arizona. An additional length of approximately 1 mile will be a full realignment for a total project length of approximately 9.1 miles. Work also includes drainage improvements, including culvert replacement and constructing new culverts: 33,000 tons of asphalt concrete pavement, gyratory mix, 97,000 tons of aggregate base, 22,000 tons of cement treated aggregate course, 219,000 cubic yards of roadway excavation, 5,200 linear feet of guardrail, 4,600 cubic yards of riprap, 2,000 linear feet of concrete box culverts, and 4,400 linear feet of metal pipe culverts.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Aggregate Surfacing, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents