Similar Projects
Water System Interconnect Upgrades
Bidding
Pompano Beach, FL

BCJC Jail Water Meter Reconfiguration
Sub-Bidding
Fort Lauderdale, FL 33301

Water Service Line Replacement
Post-Bid
Less than $600,000 est. value
Coral Springs, FL

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Cured in Place Pipe Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

Directional Boring Services
Results
Sunrise, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Fire Hydrants and Accessories
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Water Meter, Register, and Transmitter Change-Out
Results
Plantation, FL 33317

Provide an On-Site Calibration and Verification of 26 Abb Flow Meters
Term Contract
Post-Bid
Less than $10,995 est. value
Hollywood, FL

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Regional Master Meter Improvements – Bid Package 2
Results
$220,000 to $1,100,000 est. value
Fort Lauderdale, FL 33301

Force Main Upsize from PS DS-36 to PS D-35 P12413
Results
Less than $1,000,000 est. value
Fort Lauderdale, FL 33301

Unidirectional Flushing Program
Term Contract
Results
Less than $100,000 est. value
FL

Last Updated 03/03/2021 10:58 AM
Project Title

County Club Ranches Watermain

Physical Address View project details and contacts
City, State (County) Miramar, FL 33027   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,399,957
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes Phases 1A as the Primary Project, but is not limited to all labor, materials, machinery, tools, equipment and incidentals, as necessary for the installation of 6-inch watermain to be installed through a combination of an open cut installation and horizontal directional drills. Pipe material to be a combination of ductile iron pipe (DIP) and high-density polyethylene (HDPE). Pipe installation to include gate valves, fire hydrants, applicable fittings, water services, meter boxes and connections to the existing mains. Work is also to include applicable demolition and restoration required during pipe installation. The Alternate Phases, 1B and 1C will be at the sole determination of the City: o Alternate Phase 1B - is bounded by Old Miramar Parkway to the North, SW 141st Avenue to the West, SW 41st Street to the South and SW 139th Avenue to the East; and o Alternate Phase 1C - is on Old Miramar Parkway, from SW 136th Avenue to SW 124th Avenue

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents