Similar Projects
Lewis Park Shelter Building Replacement - 15-049 - City of Edina
Demolition, New Construction, Infrastructure
Conception
$900,000 CJ est. value
Edina, MN 55435

County Road 3 Improvements - 01-CIP-S104 - City of Hopkins
Infrastructure
Conception
$2,300,000 CJ est. value
Hopkins, MN 55343

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Tessman Ridge Apartments
New Construction, Infrastructure - 126,470 SF
Design
$20,400,000 CJ est. value
Brooklyn Park, MN 55445

19th Avenue/Dunkirk Lane Pond Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Plymouth, MN 55447

19th Avenue/Dunkirk Lane Pond Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Plymouth, MN 55447

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

2021 Street Surface Improvements
Results
$500,000 est. value
Hopkins, MN

2022 Trunk Watermain Improvements
Infrastructure
Results
$3,300,000 est. value
Hopkins, MN

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

The Cubes at French Lake / Dayton
New Construction, Infrastructure - 996,960 SF
Construction
$537,000,000 CJ est. value
Dayton, MN 55327

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

New Fire Station No. 11 - FIR11 - City of Minneapolis
New Construction, Infrastructure
Conception
$9,144,000 CJ est. value
Minneapolis, MN 55414

Last Updated 10/09/2023 07:17 AM
Project Title

Lift Station #3 Forcemain Replacement Project

Physical Address View project details and contacts
City, State (County) Greenwood, MN 55331   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Lift Station #3 Forcemain Replacement Project Please contact Adam Pawelk with HTPO at 952-829-0700 or apawelk@htpo.com with any questions. Site Directions: Lift station #3 is located off the north side of Hwy 7 approximately 550 feet west of Minnewashta Parkway. The force main will extend due north through backyard easements at the project terminus of 62nd Street W, near the NWC of Cathcart Park. Est. Completion Date: Dec. 29, 2023 In general the work consists of the following approximate quantities: 1080 lf 8" hdpe sdr 11.0 forcemain (directional bore) 1 each 60" sanitary mh - precast concrete 1 each 60" sanitary mh - polymer concrete or fiberglass. See project manual for additional details. The work to be done under this Contract includes, but is not necessarily limited to, furnishing all labor, materials, transportation, tools, supplies, equipment, etc. necessary for the following items: A. Installation of a directionally drilled HDPE forcemain pipe at Lift Station #3. B. Erosion and sediment control The Engineer when construction staking is needed. Includes a one-time staking of the following anticipated items: o Construction limits within the two 60' radius survey limits. o Line and grade stakes for two sanitary manholes. o Sanitary connection at the south lift station. C. Traffic control D. Site restoration The work under this Contract includes all of the work items as described in these Specifications and/or as shown on the Plans as prepared by HANSEN THORP PELLINEN OLSON, INC. Refer to the City of Chanhassen's Standard Specifications and Detail Plates for additional information. The Contractor shall coordinate site access and staging areas with City and Engineer to minimize disturbance. The Contractor shall confine work to available right-of-way and designated construction limits. In areas of limited construction easements, Contractor shall utilize special procedures and equipment to ensure confinement to available easements while not jeopardizing the safety of individuals or private property. The Contractor shall not enter for material delivery or occupy for any other purpose with persons, tools, equipment, construction materials, or with materials excavated from the trench, any private property outside the designed construction boundaries. If it is necessary or desirable that the Contractor use land outside of City right-of-way or easements, the Contractor shall obtain consent from and shall execute a written agreement with, the owner and tenant of the land. Any restoration necessary on private property outside of the temporary construction easements will be at the expense of the Contractor with no compensation from the City

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents