Similar Projects
Mill and Resurface Parking Lot
Infrastructure
Bidding
$600,000 CJ est. value
Gilson, IL 61436

Mill and Resurface Parking Lot
Infrastructure
Bidding
$600,000 CJ est. value
Gilson, IL 61436

Bituminous Material
Post-Bid
Abingdon, IL

Bituminous Material
Alteration
Post-Bid
Victoria, IL

Miscellaneous Sidewalk Removal and Replacement
Results
Galesburg, IL

PCC Pavement and Monolithic Curb Work
Results
Galesburg, IL 61401

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Sealing Coating of Various Streets
Results
Galesburg, IL

Fire Training Tower
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Galesburg, IL 61401

Crack and Joint Sealing at Various Locations in Knox, Peoria, and Tazewell Counties
Results

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Knoxville, IL 61448

2021 Intermittent Resurfacing
Results
Galesburg, IL

North Kellogg Street Reconstruction
Results
Galesburg, IL 61401

South Kellogg Street Improvements
Infrastructure
Results
Galesburg, IL 61401

Last Updated 08/29/2022 01:02 PM
Project Title

Sidewalk Repair and Replacement

Physical Address View project details and contacts
City, State (County) Victoria, IL 61485   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Occupancy, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalk repair and replacement of about 300 ft. Various spots around the Village need to have concrete removed framed, and new poured. There are 100 ft. in various spots that need to be filled and raised to street height. Village officials have mapped out locations needing to be replaced. Questions about the project may be answered by calling President John Rask at (309)368-1027.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents