Similar Projects
Sunrise Apartments Steel Staircases and Platforms
Term Contract
Bidding
Chicago Heights, IL 60411

Bird Deterrent Maintenance and Services
Term Contract, Alteration
Bidding
Chicago, IL

183 CES Replace Metal Fascia P-36
Post-Bid
Less than $25,000 est. value
Springfield, IL 62707

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Terminal Expansion - Phase 4 Signage
Renovation
Results
Rockford, IL 61109

2020 Water Pumping Station Exterior Facade Restoration
Results
$84,000 est. value
Homewood, IL 60430

Stair Improvements at Elgin High School
Alteration
Bidding
Elgin, IL 60120

Base of Stairwell Repair at Prosser High School
Post-Bid
Chicago, IL 60602

Maywood Fine Arts Exterior Remodeling
Results
Maywood, IL 60153

Amp 2 Gaines Mill Siding, Windows, Doors Replacement
Alteration
Bidding
Springfield, IL 62704

Exterior Insulation and Finish System at the New City Center - City Hall/ Police Department
Post-Bid
Crest Hill, IL

Fire Station No. 2 Exterior Improvements And Roof Replacement
Renovation
Results
Springfield, IL 62701

Infiltration and Tuckpointing at Schurz
Post-Bid
Chicago, IL 60641

DNR Buel House- Repair Foundation Walls
Results
Springfield, IL 62702

Replace Architectural Panels
Post-Bid
Less than $900,000 est. value
East Peoria, IL

Reported 07/03/2021 12:00 AM
Project Title

Housing Rehabilitation - Deck Repair

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove Front porch steps made of concrete and install new steps to code with treated lumber. Remove existing railings of the front porch and install new rails to code with treated lumber. Install gutters and downs on the front porch over hangs. Tear off existing deck from the side and back of the building. Build new deck to code from the old foot print of original deck. Use treated lumber and dig new footings for the new deck. Add two sets of steps in the location of existing steps. Use Caution while measuring or walking on existing deck. Permits required.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents