Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Oakwood Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Novi Medical Building
New Construction, Infrastructure - 2,558 SF
Design
$1,486,198 CJ est. value
Novi, MI 48377

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

2023 Water Main Improvements
Infrastructure
Bidding
$1,400,000 CJ est. value
Royal Oak, MI 48067

Quaker Valley Road Culverts Reconstruction Project
Infrastructure
Bidding
$1,080,000 CJ est. value
Farmington Hills, MI 48331

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Farmington High School Site and Building Improvements
Infrastructure
Post-Bid
Farmington, MI 48336

West Bloomfield Civic Center Emergency Access Drive Project
Results
$143,536 est. value
MI 48323

Cemetery and Volunteer Park Grading Project
Results
$115,000 est. value
South Lyon, MI

ATAP Early Childhood Gymnasium and Classroom Renovations
Renovation - 9,691 SF
Construction
$700,000 est. value
Pontiac, MI 48341

La Salette Multi-Family Development - The Ivy
Infrastructure, Renovation - 22,923 SF
Construction
$5,000,000 CJ est. value
Berkley, MI 48072

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Zeenat Plaza
New Construction, Infrastructure - 21,421 SF
Pending Verification
$11,000,000 CJ est. value
Rochester Hills, MI 48307

Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Last Updated 01/09/2023 09:39 AM
Project Title

Early Childhood Center - 2022 Bond - Clarkston Community Schools

Physical Address View project details and contacts
City, State (County) Clarkston, MI 48346   (Oakland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work includes door hardware replacements, sidewalk replacement, and infrastructure improvements. As of January 9, 2023, this project is in the design phase. An architect and construction manager has been selected for the project. Bidding is expected to take place in fall of 2023 and construction is expected to take place in spring of 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents