Last Updated 03/06/2021 01:56 AM
Project Title

Bike Path from East of Illinois Route 31 into the Park

Physical Address View project details and contacts
City, State (County) Cary, IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

20100110 Unit Tree Removal (6 To 15 Units Diameter) Base Items 79.000 20101000 Foot Temporary Fence Base Items 1,500.000 20101200 Each Tree Root Pruning Base Items 5.000 20101300 Each Tree Pruning (1 To 10 Inch Diameter) Base Items 10.000 20101350 Each Tree Pruning (Over 10 Inch Diameter) Base Items 10.000 20200100 Cu Yd Earth Excavation Base Items 465.000 20201200 Cu Yd Removal And Disposal Of Unsuitable Material Base Items 195.000 20400800 Cu Yd Furnished Excavation Base Items 705.000 20800150 Cu Yd Trench Backfill Base Items 4.000 21001000 Sq Yd Geotechnical Fabric For Ground Stabilization Base Items 1,070.000 21101505 Cu Yd Topsoil Excavation And Placement Base Items 5,228.000 25000100 Acre Seeding, Class 1 Base Items 0.150 25100125 Acre Mulch, Method 3 Base Items 8.050 25200200 Unit Supplemental Watering Base Items 2.000 28000250 Pound Temporary Erosion Control Seeding Base Items 803.000 28000305 Foot Temporary Ditch Checks Base Items 60.000 28000400 Foot Perimeter Erosion Barrier Base Items 6,965.000 30300112 Sq Yd Aggregate Subgrade Improvement 12" Base Items 565.000 35101400 Ton Aggregate Base Course, Type b Base Items 1,300.000 35101800 Sq Yd Aggregate Base Course, Type b 6" Base Items 565.000 35102000 Sq Yd Aggregate Base Course, Type b 8" Base Items 10,800.000 35102400 Sq Yd Aggregate Base Course, Type b 12" Base Items 1,355.000 35200410 Sq Yd Processing Soil-Cement Base Course 10" Base Items 4,320.000 35200500 100 Wt Cement Base Items 2,510.000 40600275 Pound Bituminous Materials (Prime Coat) Base Items 21,481.000 40600290 Pound Bituminous Materials (Tack Coat) Base Items 2,153.000 40603080 Ton Hot-Mix Asphalt Binder Course, Il-19.0, n50 Base Items 1,565.000 40604060 Ton Hot-Mix Asphalt Surface Course, Il-9.5, Mix "d", n50 Base Items 1,060.000 48101500 Sq Yd Aggregate Shoulders, Type b 6" Base Items 250.000 54213669 Each Precast Reinforced Concrete Flared End Sections 24" Base Items 2.000 542a0229 Foot Pipe Culverts, Class a, Type 1 24" Base Items 33.000 60100060 Each Concrete Headwalls For Pipe Drains Base Items 6.000 60108400 Foot Pipe Underdrains 10" (Special) Base Items 108.000 60108500 Foot Pipe Underdrains 12" (Special) Base Items 78.000 67100100 l Sum Mobilization Base Items 1.000 72000100 Sq Ft Sign Panel - Type 1 Base Items 66.000 72800100 Foot Telescoping Steel Sign Support Base Items 285.000 78000200 Foot Thermoplastic Pavement Marking - Line 4" Base Items 1,311.000 a2006716 Each Tree, Quercus Macrocarpa (Bur Oak), 2" Caliper, Balled And Burlapped Base Items 6.000 a2007116 Each Tree, Quercus Rubra (Red Oak), 2" Caliper, Balled And Burlapped Base Items 6.000 x0326406 Each Information Kiosk Complete Base Items 1.000 x0326806 l Sum Washout Basin Base Items 1.000 x0327487 Sq Yd Triaxial Geogrid Reinforcement, Type i Base Items 1,575.000 x2130010 Foot Exploration Trench, Special Base Items 50.000 x2502024 Acre Seeding, Class 4b (Modified) Base Items 7.900 x2511630 Sq Yd Erosion Control Blanket (Special) Base Items 6,668.000 x4240430 Sq Ft Portland Cement Concrete Sidewalk 5 Inch, Special Base Items 4,738.000 x6029510 Each Catch Basins, Type c, With Special Frame And Grate Base Items 10.000 x7010216 l Sum Traffic Control And Protection, (Special) Base Items 1.000 Xx000503 Foot Split Rail Fence Base Items 215.000 Xx006729 Foot Perimeter Erosion Barrier, Rolled Excelsior Base Items 385.000 Xx009334 Each Bicycle Repair Station Base Items 1.000 z0003850 Each Benches Base Items 12.000 z0013798 l Sum Construction Layout Base Items 1.000 z0064800 Unit Selective Clearing Base Items 12.000 z0076600 Hour Trainees Base Items 500.000 $0.80 z0076604 Hour Trainees Training Program Graduate Base Items 500.000 $15.00

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents