Similar Projects
Worth It Living Time Share/Vacation Club Community
New Construction
Conception
Kissimmee, FL 324747

Industrial Park
New Construction - 284,200 SF
Conception
Kissimmee, FL 34741

McLane SunEast Expansion
New Construction, Addition - 216,272 SF
Design
Kissimmee, FL 34758

Big Sky Self-Storage
New Construction - 115,843 SF
Design
Kissimmee, FL 34744

535 Plaza Office Building Shell
New Construction - 21,055 SF
Post-Bid
$850,000 est. value
Kissimmee, FL 34746

Low Bid Design-Build Sun Rail Vehicle Storage and Light Maintenance Facility (VSLMF) Noise Wall
Alteration
Post-Bid

Storage Trailers, Ground Box Storage Containers and Mobile Office Rentals
Term Contract
Results
Kissimmee, FL 34744

Construction Manager at Risk for the County's Fire EMS Logistics Warehouse and Facilities Maintenance Complex
New Construction
Results
Less than $3,655,500 est. value
Kissimmee, FL 34741

Sunbridge Mixed-Use Development Master Plan
New Construction
Construction
Orlando, FL

StorQuest Express Self-Storage
New Construction - 66,922 SF
Construction
Kissimmee, FL 34743

Tupperware Brands Headquarters Campus
Renovation - 216,000 SF
Pending Verification
Kissimmee, FL 34746

SPUR Apartments
New Construction - 24,720 SF
Design
Kissimmee, FL 34741

Design-Build for Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facility All-Electronic Tolling (AET) Conversion
Results
Kissimmee, FL 34741

Old Town Entrance Plaza - Shell Building
New Construction - 10,242 SF
Construction
$1,260,000 est. value
Kissimmee, FL 34746

Storage Authority
New Construction - 81,200 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Kissimmee, FL 34741

Last Updated 08/03/2021 11:43 AM
Project Title

Orlando Utilities Commission Operations and Maintenance Facility

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL   (Osceola County)
Category(s) Commercial, Transportation
Sub-Category(s) Misc. Structures, Office, Warehouse/Storage
Contracting Method General Contractor to Subcontract.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complex to include: Warehouse, Fleet Services Building, Pavilion Building. Future Phase to include: Additional Office Space and Warehouse, Parking Deck, Covered Storage area.

Details

61,233 SF - 1 Office, 2,372 SF New Construction, 1 Warehouse/Storage, 42,623 SF New Construction, 1 Misc. Structures, 18,610 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Protective Covers, Transportation Stop Shelters, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating, Pews and Benches, Benches.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents