Similar Projects
Public Works Minor Construction Projects with Costs less than $2,000,000.00
Bidding
Less than $15,000,000 est. value
FL

Add Lanes and Reconstruct/Drainage Improvements
Bidding
$18,109,846 est. value
FL

Pavement Management Program for Seminole County
Results
Less than $6,244,033 est. value
Sanford, FL 32771

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Road and Trail Construction - West Seminole Boulevard, Riverwalk Phase III
Results
Less than $11,000,000 est. value
Sanford, FL 32771

Milling and Paving
Results
Less than $1,400,000 est. value
Lake Mary, FL

Resurfacing
Results
Less than $6,189,318 est. value
FL

Milling and Resurfacing
Results
Less than $14,941,053 est. value
FL

Widen/Resurface Existing Lanes/Drainage Improvements/Traffic Signals
Results
Less than $9,541,345 est. value
FL

Design Build Push Button Contract No. 2 – Program Management
Results

PW 1405 Concord Drive Improvements
Results
Casselberry, FL

Safety Project/Traffic Signals/Milling and Resurfacing/Drainage Improvements
Results
Less than $1,371,222 est. value
FL

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

Asphalt Repair
Results
Less than $540,000 est. value

Asphalt Resurfacing of Various City Streets Fiscal Year 2020-2021
Results
Less than $1,974,438 est. value
Oviedo, FL 32762

Last Updated 12/19/2019 09:47 AM
Project Title

PW 1902 & 1903 Road & Trail Rehabilitation

Physical Address View project details and contacts
City, State (County) Casselberry, FL 32707   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $955,707
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work which includes multiple locations throughout the City for milling and resurfacing various roadways and trails, isolated base repairs, construction of new and replacement of existing curb ramps, and signing and pavement markings. The various locations are shown on the roadway resurfacing tabulations and plans for the curb ramp replacements. Work includes maintenance of traffic, clearing and grubbing, milling and resurfacing, sod, concrete sidewalk, concrete curb, concrete driveway aprons, detectable warnings, traffic signal loops, isolated base repairs, manhole and valve adjustments, and signing and pavement markings, along with all required Maintenance of Traffic (MOT) following FDOT standard specifications and all necessary Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMPs) required by local jurisdictions. The engineering cost estimate for this project is $955,707.84 for the base bid and $749.89 for the bid alternative.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents