Similar Projects
Hideaway Lane Condominiums
New Construction
Conception
Ann Arbor, MI 48105

Rose Senior Living - Assisted Living and Independent Living Facilities
New Construction, Renovation, Demolition - 200,514 SF
Conception
Farmington Hills, MI 48336

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Avant Multi-Family Development
New Construction
Design
$30,000,000 est. value
Ann Arbor, MI 48103

Home Rehabilitation - Grandville
Renovation
Bidding
Grandville, MI 49418

Harbor Row Townhomes
New Construction
Post-Bid
Ludington, MI 49431

Comprehensive Maintenance/Vacant Unit Prep Services
Renovation
Post-Bid
River Rouge, MI

Request for Proposals for Purchase and Development of Property
Results
Suttons Bay, MI 49682

Housing Rehabilitation - Kent City
Renovation
Results
Kent City, MI 49330

Michigan Meadows
New Construction
Construction
Grand Rapids, MI 49503

Cross Creek Condos
Renovation
Construction
Grand Rapids, MI 49508

Valhalla Ann Arbor
New Construction, Demolition
Pending Verification
$100,000,000 est. value
Ann Arbor, MI 48103

Linda Lane Duplexes and Homes
New Construction - 4,800 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sterling Heights, MI 48312

Novaplex Townhomes and Apartments
New Construction
Conception
Novi, MI 48374

GFA Long Lake Townhomes
New Construction
Design
Troy, MI 48083

Last Updated 08/09/2021 07:59 AM
Project Title

Barrier Free Shower Renovation at Three Family Homes

Physical Address View project details and contacts
City, State (County) Bay City, MI 48708   (Bay County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the exiting steel bathtub and fiberglass surround and replace with fiberglass barrier free shower. To fit new shower, contractor should expect one possibly, two gypsum walls and one electrical outlet (306 37th) may require relocation. Replacement materials will need to conform to construction building codes using moisture resistant board. Install three grab bars for each shower and curtain rods with anchored to solid wood. Approved materials noted on page 3. Walls must be primed and finish painted to match existing colors. Add access panel for the shower control valve on parallel wall. An alternate bid is requested if a smaller replacement window is needed to accommodate a deeper shower stall.

Details

Multi-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents